-ry Interim Corrective Action Plan—Tosco(76) Service Station No. 11195,Lathrop,California
<br /> Au st 28,2002
<br /> Once the remedial system is installed and operating for as period of six months, a system status report
<br /> will be issued,which will include progress monitoring results. Further status reports will be prepared
<br /> and submitted on a semi-annual basis.
<br /> 4.0 REFERENCES
<br /> Gettler-Ryan Inc., 2002, Monitoring Well Installation Report, Tosco (Former BP) Service Station No.
<br /> 11195, 16500 South I-5, Lathrop CA.,Dated July 24, 2002.
<br /> ...,2002,Groundwater Monitoring and Sampling Report,Second Quarter-Event of May 23,2002,Dated
<br /> July 8, 2002.
<br /> ...2002,Subsurface Investigation Report,Tosco(Former BP)Service Station No.11195,16500 South I-5,
<br /> Lathrop CA,Dated April 11, 2002.
<br /> Alisto Engineering Group, 1999,Additional Site Investigation Report,Former BP Oil Company Site No.
<br /> 11195, 16500 South Interstate I-5, Lathrop, California,Dated January 25, 1999.
<br /> California Regional Water Quality Control Board, 1998,The Water Quality Control Plan(Basin Plan)
<br /> for the Central Valley Region, Fourth Edition— 1998, dated September 1, 1998.
<br /> Gettler-Ryan Inc. 1997, Waste Oil UST and Remote Fill Line Soil Sampling Report, 16500 South
<br /> Interstate 1-5, Lathrop, California, Dated August 6, 1997.
<br /> Lawrence Livermore National Laboratory,1995,Recommendations to Improve the Cleanup Process for
<br /> California's Leaking Underground Fuel Tanks, dated October 1995.
<br /> U.S. Geological Survey, 1952,Lathrop Quadrangle,California,7.5 Minute Series(Topographic): Scale
<br /> 1:24,000, photorevised 1987.
<br /> r.
<br /> 140193.13 12
<br />
|