Laserfiche WebLink
-ry Interim Corrective Action Plan—Tosco(76) Service Station No. 11195,Lathrop,California <br /> Au st 28,2002 <br /> Once the remedial system is installed and operating for as period of six months, a system status report <br /> will be issued,which will include progress monitoring results. Further status reports will be prepared <br /> and submitted on a semi-annual basis. <br /> 4.0 REFERENCES <br /> Gettler-Ryan Inc., 2002, Monitoring Well Installation Report, Tosco (Former BP) Service Station No. <br /> 11195, 16500 South I-5, Lathrop CA.,Dated July 24, 2002. <br /> ...,2002,Groundwater Monitoring and Sampling Report,Second Quarter-Event of May 23,2002,Dated <br /> July 8, 2002. <br /> ...2002,Subsurface Investigation Report,Tosco(Former BP)Service Station No.11195,16500 South I-5, <br /> Lathrop CA,Dated April 11, 2002. <br /> Alisto Engineering Group, 1999,Additional Site Investigation Report,Former BP Oil Company Site No. <br /> 11195, 16500 South Interstate I-5, Lathrop, California,Dated January 25, 1999. <br /> California Regional Water Quality Control Board, 1998,The Water Quality Control Plan(Basin Plan) <br /> for the Central Valley Region, Fourth Edition— 1998, dated September 1, 1998. <br /> Gettler-Ryan Inc. 1997, Waste Oil UST and Remote Fill Line Soil Sampling Report, 16500 South <br /> Interstate 1-5, Lathrop, California, Dated August 6, 1997. <br /> Lawrence Livermore National Laboratory,1995,Recommendations to Improve the Cleanup Process for <br /> California's Leaking Underground Fuel Tanks, dated October 1995. <br /> U.S. Geological Survey, 1952,Lathrop Quadrangle,California,7.5 Minute Series(Topographic): Scale <br /> 1:24,000, photorevised 1987. <br /> r. <br /> 140193.13 12 <br />