Laserfiche WebLink
-2- <br /> Community Development Department <br /> PA-1900290 (SA) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 5. Prior to issuance of the occupancy permit a Wastewater Discharge Permit must be submitted to the <br /> Public Works Department. <br /> 6. This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase I National Pollutant Discharge Elimination <br /> System(NPDES)peri-nit and shall comply with the following conditions: <br /> a) All new construction and substantial improvement of any structure in the area of special <br /> flood hazard shall be elevated or floodproofed in accordance to San Joaquin County <br /> Ordinance Code Section 9-1605.12(a)b,(b)and(c). <br /> b) Documentation shall be provided showing the owner has verified if an Industrial Storm I <br /> Water Permit is required from the State Water Resources Control Board(SWRCB). <br /> AC:CH <br /> I <br /> E <br /> I <br /> , <br /> i <br /> i <br /> } <br /> i <br /> , <br /> i <br />