Laserfiche WebLink
I , Department of Public Works <br /> S A N ��J O A Q U IN _ Kris Balaji,Director of Public Works <br /> COUNTY - <br /> Fritz Buchman,Deputy Director/Development <br /> Greatness grows here. <br /> Workingfor YOU Jim Stone,Deputy Director/Operations <br /> Najee Zarif,Interim Deputy Director/Engineering <br /> February 3,2020 Knsti Rhea,Manager of Strategic Initiatives <br /> MEMORANDUM RECEIVED <br /> TO: Community Development Department E E8 - 1 2020 <br /> CONTACT PERSON: Rick Griffin <br /> San Joaquin County <br /> FROM: Alex Chetley,Engineering Services Managerld r— Community Development <br /> Development Services Division <br /> SUBJECT: PA-1900187;A Site Approval application to establish a parking facility for a maximum <br /> of forty-four(44)truck/trailer units. The facility will be unmanned and accessible twenty- <br /> four hours per day, seven days per week; located on the east side of South El Dorado <br /> Street, 1,105 feet south of French Camp Road,French Camp. (Supervisorial District 1) <br /> PROPERTY OWNER: Jamail Singh Tut APPLICANT: Same <br /> ADDRESS: 7130 S.El Dorado Street,French Camp APN: 193-070-07 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System(NPDES). <br /> Harlan Road has an existing and planned right-of-way width of 60 feet. <br /> El Dorado Street has an existing right-of-way width of 100 feet and a planned right-of-way width of 84- <br /> 110 feet. <br /> RECOMMENDATIONS: <br /> 1) The applicant shall provide and operational analysis for truck and vehicle movements. The analysis <br /> shall include ingress and egress using the largest proposed vehicle,truck or trailer and include <br /> movements through the site. <br /> 2) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 3) The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 4) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> U Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />