Laserfiche WebLink
S J C O G, Inc. <br /> 555 Erik Weber Avenue • Skockkon,CA 95202 . (209)235-0600 . FAX(209)235-0438 <br /> San Joaquin Cou.fy Multi-Species Habitat C­­H­fy Open Space Plan(SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Alise Goulart,San Joaquin County,Community Development Department <br /> From: Laurel Boyd,SJCOG, Inc. <br /> Date: February 7,2020 <br /> Local Jurisdiction Project Title: PA-2000012(UP) <br /> Assessor Parcel Number(s): 013-090-33,-34,-35 <br /> Local Jurisdiction Project Number: PA-2000012(UP) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Natural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Sanfilippo: <br /> SJCOG, Inc. has reviewed the application referral for PA-2000012 (UP). This project consists of a Use Permit application <br /> for a small winery to be constructed in two (2) phases over five (5) years. Phase 1 includes the construction of a 10,530 <br /> square foot winery production building for a variety of uses (work area and barrel storage, refrigerated storage, office, <br /> conference room, tank storage & restrooms) and a 2,300 square foot covered crush pad. Phase 2 includes the <br /> construction of a 9,930 square foot multi-purpose building for events (event space, kitchen, bar, restrooms & storage), a <br /> 1,500 square foot wine tasting room, a water tower, and a 9,500 square foot expansion to the Phase 1 winery production <br /> building. Daily winery operations are planned for eight (8) hours per day 9 am to 5 pm, seven (7) days per week with six <br /> (6) employees with an average of thirty (30) customers per day Monday through Friday and 100 customers per day on <br /> Saturday and Sunday. The winery proposes to have twelve (12) Marketing Events per year with a maximum of eighty <br /> (80) attendees; and sixty (60) Large-scale Accessory Winery Events per year with a maximum of 300 attendees; and four <br /> (4)Wine Release events per year with a maximum of 300 attendees. Outdoor amplified sound is proposed for use during <br /> Marketing Events and Large-scale Accessory events. The site will utilize an on-site private well, septic system, and on- <br /> site private well, septic system, and on-site stormwater drainage. The project site is on a private easement 2,600 feet <br /> North of Davis Road, one mile south of Peltier Road, Lodi (APN/Address: 013-090-33, -34, -35/20814 North Davis Road, <br /> Lodi). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sjcog.org <br /> If this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following process <br /> must occur to participate in the SJMSCP: <br /> Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Miniknization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br />