My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081403 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANN
>
21300
>
2600 - Land Use Program
>
SR0081403 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2020 9:39:28 AM
Creation date
2/4/2020 8:35:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081403
PE
2602
STREET_NUMBER
21300
Direction
N
STREET_NAME
MANN
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01729009
ENTERED_DATE
11/14/2019 12:00:00 AM
SITE_LOCATION
21300 N MANN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McCamplbellsAnalytical, Inc. CHAIN-OF-CUSTODY RECORD Page 1 of 1 <br /> 1534 Wil—' Pittsburg,CA 94565-1701 WorkOrder: 1912D43 ClientCode: PLGC <br /> (925)252-9262 ❑WaterTrax WriteOn EDF Excel �EQuIS ❑Email ❑HardCoPY ThirdPartY J-flag <br /> ®Detection Summary FN <br /> Dry-Weight <br /> Report to: Bill to: Requested TAT: 5 days; <br /> Daniel Kramer Email: dkramer@petralogix.com Accounts Payable <br /> Petralogix cc/3rd Parry: Petralogix <br /> 26675 Bruella Road PO: 26675 Bruella Road Date Received. 12/27/2019 <br /> Galt, CA 95632 Project: 2019-00095; Mann Road NLS/SSS Galt, CA 95632 Date Logged. 12/27/2019 <br /> (209)400-5729 FAX <br /> Requested Tests(See legend below) <br /> Lab ID Client ID Matrix Collection Date Holdl 1 l 2 l 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 <br /> 1912D43-001 I Domestic Well Water 1 12/27/2019 10:00 ❑ LAB I A <br /> 1912D43-002 Trip Blank Water 12/27/2019 10:00 ❑ A A <br /> Test Legend: <br /> 1 300_1 W 2 524_3_504 W 3 PRDisposal Fee 4 <br /> 5 6 7 8 <br /> 9 F,-017 11 12 <br /> Project Manager: Rosa Venegas Prepared by: Tina Perez <br /> Comments: <br /> NOTE: Soil samples are discarded 60 days after results are reported unless other arrangements are made(Water samples are 30 days). <br /> Hazardous samples will be returned to client or disposed of at client expense. <br /> Page 8 of I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.