Laserfiche WebLink
MATRIX SPIKE SAMPLE EVALUATION REPORT <br /> TOTAL Metals <br /> Client Lot #. . . . AOH130563 Matrix. . . . . . . . . . WATER <br /> Date Sampled. . . : 08/17/10 07:30 Date Received. . : 08/18/10 <br /> PERCENT RECOVERY RPD PREPARATION- WORK <br /> PARAMETER RECOVERY LIMITS RPD LIMITS METHOD ANALYSIS DATE ORDER # <br /> MS Lot-Sample #: AOH180565-001 Prep Batch #. . . : 0235116 <br /> Mercury 143 N (71 - 125) CFR136A 1631E 08/23-08/24/10 L5RH61AC <br /> 156 N (71 - 125) 4.4 (0-24) CFR136A 1631E 08/23-08/24/10 L5RH61AD <br /> Dilution Factor: 5 <br /> NOTE(S) : <br /> Calculations are performed before rounding to avoid round-off errors in calculated results. <br /> N Spi ked anal yte recovery i s outsi de stated control I i mi ts. <br /> Page 25 of 49 <br /> 15 of 19 <br />