My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Mike Infurna [EH] <br /> From: Joey Pace Upace@ecostmanage.com] <br /> Sent: Friday, December 04, 2009 11:15 AM <br /> To: Mike Infurna [EH] <br /> Cc: 'Joseph Plummer" 'Tiffany Looff <br /> Subject: RE: City of Ripon Encroachment Permit 3317 (attached) <br /> Mike: You are correct, it is not anticipated that a grout inspection will be required on December 7th. The <br /> Fifth Street well (M-54C) will be started that day and most likely not ready for grouting until the following <br /> afternoon. I have cc'd the field geologist for this well on this email and he will be the one to contact you <br /> (209-468-3454) at the end of each working day. <br /> I will be the field geologist, starting December 14th, for the other four wells. We are starting with M-50A <br /> and M-51A, the 70 foot wells at 230 Industrial, And I will call you from the site on the 14th to tell you of <br /> our progress and also at the end of each subsequent day. <br /> Thank you very much for getting these permits to me and in PDF format. Much appreciated. <br /> Joey Pace <br /> ECM. Inc. <br /> 714-599-5364 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Friday, December 04, 2009 10:59 AM <br /> To: Joey Pace <br /> Subject: RE: City of Ripon Encroachment Permit 3317 (attached) <br /> as promised, <br /> attached are the 3 INSTALLATION permits. You're confirmed to start work Dec 7. <br /> 1 understand you do not anticipate a grout inspection (required) this day. correct me <br /> if I'm mistaken. <br /> Please have your field tech call me the end of each day you do NOT see an EHD <br /> inspector onsite. We'll need updates on the status/progress of the drilling and <br /> status of the open hole [eft overnight. Make every attempt to protect any UNgrouted <br /> borehole from surface contamination migration. <br /> my office phone ( 209-468-3454) voice mail is 24/7. call it every end of working day <br /> and definately before 8am the following day and leave a message. Include work <br /> completed that day and plans for the next day's work. If I do not receive a status <br /> call by 8am for the previous day's work, I will be onsite the following morning. <br /> Inspection fees are $115/hour and the calls can save your RP some money and me <br /> time by not having to be onsite. <br /> thank you. <br /> 12/4/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.