Laserfiche WebLink
TEL No Oct 16 92 928 No . 005 P .02 <br /> FACILITY: Nestle Beverage co. <br /> 230 Industrial Ave. <br /> LOCATION: Ripon <br /> CONSULTANT: Sara Black <br /> Applied Environmental <br /> PROPOSAL DATE: 13 October 1992 <br /> [ ] Monitoring Well (s) <br /> [ ] Soil Boring(s) <br /> [ ] Soil Excavation(s) Depth <br /> X 2 Vapor Extraction Wells <br /> We have reviewed the above proposal concerning the above check items and the <br /> proposal is acceptable. <br /> The vapor extraction wells are to be installed to a depth of about 25' bgs. One well <br /> is on-site near the chemical storage shed near VE-6 and the other well is off-site near <br /> M-a. <br /> Date: 16 October 1992 Staff Signature: � � � <br /> i <br />