My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> RUTUENVIRONMENT& 0921YZA <br /> NFR.TRUCTURE <br /> SEP 1 RUST Environment&Infnm =Inc <br /> 2 1994 6143 South Willow Drive,Suite 200 <br /> Englewood,CO 80111-5123 <br /> ENVIRONMENTAL HEALTH Tel.(303)694-6660•FAX(303)694-4410 <br /> September 7, 1994 PERMIT/SERVICES <br /> Ms. Linda Turkatte, Senior REHS <br /> Public Health Services, San Joaquin County <br /> Environmental Health Division <br /> 445 N. San Joaquin Street <br /> P.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Re: Transmittal of Final Remedial Investigation Report - Nestle Beverage Ripon Facility <br /> RUST E&I Project No. 88853.000 <br /> Dear Ms. Turkatte: <br /> On behalf of Nestle Beverage Company, RUST Environment & Infrastructure (RUST E&I) <br /> hereby submits the Final Remedial Investigation Report (RI) for the Nestle Ripon facility, in <br /> response to your letter to Frank Zumstein dated August 29, 1994. We regret the oversight in <br /> not submitting the document directly to you earlier, but had assumed that a copy would be <br /> provided to you by the Regional Water Quality Control Board staff. In response to your letter, <br /> all future correspondence will be directly copied to you regarding the ongoing activities at the <br /> facility. We have also included a followup letter to RWQCB responding to their comments on <br /> the document. <br /> Please do not hesitate to call if you have any questions. <br /> Sincerely, <br /> RUST EwntoNmENT & INFRASTRUCTURE <br /> sar'� � 5�alck� <br /> Sara R. Black <br /> Project Manager <br /> Enclosures <br /> cc: Frank Zumstein <br /> John Meling <br /> Sandy Williams <br /> Walt Carey <br /> File <br /> 88853%090794.LTR <br /> Quality through teamwork �i <br />
The URL can be used to link to this page
Your browser does not support the video tag.