My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/08/99 THU 15:12 FAX GROUNDWATER 19004 <br /> Since submittal of the Feasibility extraction and treatment, soil selected and implemented <br /> Study in 1994, Nestle has vapor extraction was (planned for mid 2000), Nestle <br /> continued groundwater implemented to address TCE in will continue interim groundwater <br /> monitoring and sampling and four source areas. Since TCE is extraction and treatment. <br /> interim remedial actions in a volatile chemical, it can be <br /> accordance with the C&A Order. "stripped" from the soil by In addition, Nestle plans to Install <br /> inducing air flow through the soil additional groundwater extraction <br /> Nes0e has undertaken several using a series of shallow wells. wells as appropriate to remove <br /> actions to address the presence Soil vapor extraction has been more TCE which will ultimately <br /> of TCE in the soil and effective in removing TCE from reduce groundwater impacts. <br /> groundwater, and to investigate soil and has significantly One such well, is currently <br /> the potential applicability of eliminated potential sources of planned near a former sewer line <br /> technologies to groundwater and further groundwater impact. leak along Stockton Avenue <br /> soil cleanup. These initial southwest of the former plant <br /> cleanup actions are called Remedial actions taken to date and will be placed on line in the <br /> interim remedial actions and are have been successful in Spring of 1999. This location is <br /> discussed below. removing significant amounts of ne of the sites where soil vapor <br /> TCE from the soil and is bell xtraction was performed (see <br /> Groundwater to be complete. D rgure 1). <br /> In 1986, a granular activated <br /> IR <br /> carbon (GAC)treatment system <br /> was installed to treat the FUTURE PLANS <br /> production water from tie main COMMUNITY CONTACTS <br /> plant well, which was used for Nestle is continuing to evaluate <br /> manufacturing.Activated carbon final cleanup actions for the site. Salifomia Regional Water <br /> treatment i5 a commonly used A Final Feasibility Study Quality Control Board <br /> technology to remove impurities Addendum is planned for 3141 Routier Road, Suite A; <br /> in water including organic submittal to the Regional Board Sacramento, CA 95827 <br /> chemical solvents like TCE. in the Fall of 1999. Furthermore, Robert Reeves, Project <br /> Nestle is actively pursuing Manager(916)255-3050; <br /> In July 1995, the Nestle innovative technologies that may email: reevesr@rbSs.swrcb. <br /> production well was abandoned speed up the cleanup of the site, ca.gov <br /> along with all the Nestle and a pilot study is scheduled for <br /> production wells and was the Summer of 1999. This pilot San Joaquin Countv Public <br /> replaced by another well study will evaluate the potential Health Services <br /> designed to continue removal of to destroy TCE In the 104 E.Weber Ave.,Third <br /> TCE from the groundwater in the groundwater. Floor;Stockton,CA 95202 <br /> vicinity of the plant. The existing Carol Oz, Health Specialist <br /> carbon treatment system has Depending on the results of the (209)488-3440 <br /> been treating between 120 and pilot study, final cleanup plans <br /> 140 gallons per minute (gpm)of will be developed and the public 12eeartment of Health <br /> impacted groundwater since will be given opportunity for Services <br /> 1986. The plant has since review and comment. <br /> ceased operations; however, <br /> Nestle continues to pump the Ultimately,cleanup levels for the <br /> most impacted groundwater and groundwater will be based on <br /> operate the treatment system, in beneficial uses of groundwater Modesto,CA <br /> ordertocontinue removal ofTCE (i.e., domestic, municipal, <br /> from groundwater in the former industrial and agricultural uses) Nestie USA <br /> plant area, and protection of human health 800 North Brand Blvd.; <br /> and the environment. Glendale,CA 91203 <br /> Soils Binayak Acharya, Project <br /> In addition to groundwater Until final cleanup actions are Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.