My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRAP PERFORMANCE ASSESSMENT IMPLEMENTATION SCHEDULE <br /> Former Nestl6 USA, Inc. Facility <br /> Ripon, CA <br /> Date Activity Timeline <br /> Measure water levels A Prior to EU-3 shutdown <br /> Sample wells for VOCs 6 Prior to shutdown <br /> 21-Nov-11 Measure water levels A One hour after shutdown <br /> Measure water levels A Two hour after shutdown <br /> Measure water levels A Three hour after shutdown <br /> 22-Nov-11 Measure water levels A One day after shutdown <br /> 23-Nov-11 Measure water levels A Two days after shutdown <br /> 28-Nov-11 Measure water levels A One week after shutdown <br /> Sample wells for VOCs c <br /> S-Dec-11 Measure water levels A Two weeks after shutdown <br /> Sample wells for VOCs c <br /> 12-Dec-11 Measure water levels A Three week after shutdown <br /> Sample wells for VOCs c <br /> 19-Dec-11 Measure water levels A Four weeks after shutdown <br /> Sample wells for VOCs e <br /> 26-Dec-11 Measure water levels A Five weeks after shutdown <br /> Sample wells for VOCs <br /> Review water level and VOC data and discuss the results with RWQCB. <br /> Week of 26-Dec-11 Determine whether to continue or discontinue testing. <br /> 2-tan-12 Measure water levels A Six weeks after shutdown <br /> Sample wells for VOCs c <br /> 9-Jan-12 Measure water levels A Seven weeks after shutdown <br /> Sample wells for VOCs c <br /> 16-Jan-12 Measure water levels A Eight weeks after shutdown <br /> Sample wells for VOCs c <br /> 23-Jan-12 Measure water levels A Nine weeks after shutdown <br /> Sample wells for VOCs e <br /> 17-Feb-12 Submit Evaluation Letter providing an assessment Thirteen weeks after shutdown <br /> of IRAP to the RWQCB <br /> NOTES: <br /> VOCs=volatile organic compounds <br /> RWQCB= Regional Water Quality Control Board <br /> A=EU-3, EU-4, M-46A, M-47A, M-48A, M-49A,M-50A, M-51A,M-1A, M-1B, M-4B, EW-1, EU-1, EU-2, ED-1, ED-2, EE- <br /> A,and EI-1 <br /> s= EU-3, EU-4, M-46A, M-47A, M-48A, M-49A,M-50A, M-51A, M-1A, M-113, and EI-1 <br /> c= EU-3, EU-4, M-47A, M-50A, M-51A,and M-1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.