|
22 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle
<br /> Facility and Surrounding Area, Ripon
<br /> 23 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc.
<br /> Facility Ripon, CA. January 29, 2011.
<br /> 24 Reference unavailable.
<br /> 25 IT Corporation, September 11, 2000. Permanganate Pilot Study Six Month Summary Report
<br /> (Revised) Former Nest16 USA—Beverage Division, Inc. Facility, Ripon, California
<br /> 26 Geomatrix Consultants, April 2006. Initial Testing and Characterization Report, In Situ Groundwater
<br /> Remediation Program, Former Nestle Facility, Ripon, California
<br /> 27 Environmental Cost Management, Inc., March 31, 2008, Revised October 15, 2008. 2007 Annual
<br /> Groundwater Monitoring Report, Nestle USA, Inc. Facility, Ripon CA.
<br /> 28 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc.
<br /> Facility Ripon, CA. January 29, 2011.
<br /> 29 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle
<br /> Facility and Surrounding Area, Ripon.
<br /> 30
<br /> Environmental Cost Management, Inc., February 4, 2008. Interim Remedial Action Plan, Well
<br /> Installation and Aquifer Test Report, Former Nestle USA, Inc. Facility, Ripon, California— 95366.
<br /> 31 Environmental Cost Management, Inc., April 4, 2008. Industrial Avenue Facility Interim Remedial
<br /> Action Plan Groundwater Extraction System Startup Report, Former Nest16 USA, Inc. Facility, Ripon,
<br /> California—95366.
<br /> 32 Environmental Cost Management, Inc. M-10A Investigation Report, Former Nestle USA, Inc. Facility,
<br /> Ripon, California. November 30, 2010.
<br /> 33 Environmental Cost Management, Inc., November 9, 2009. Re: Stockton Avenue Groundwater
<br /> Extraction System Shut-down Request, Former Nestle USA, Inc. , 230 Industrial Avenue, Ripon, CA
<br /> 95366.
<br /> 34 Environmental Cost Management, Inc., April 15, 2010. Monitoring Well Installation Report for the
<br /> Industrial and Stockton Avenue Extraction and Treatment Systems, Former Nestle USA, Inc. Facility,
<br /> Ripon, California—95366.
<br /> 35 Environmental Cost Management, Inc., July 7, 2010. Re: Stockton Avenue Groundwater Extraction
<br /> System Shutdown Request, Former Nest/6, USA, Inc. Facility, 230 Industrial Avenue, Ripon, CA 95366.
<br /> 36 Regional Water Quality Control Board—Central Valley Region, September 3, 2010. Stockton Avenue
<br /> Groundwater Extraction System Shutdown Request, Former Nestle USA, Inc. Facility, Ripon, San
<br /> Joaquin County.
<br /> Appendix A
<br /> Page A7 of A7
<br />
|