Laserfiche WebLink
22 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle <br /> Facility and Surrounding Area, Ripon <br /> 23 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc. <br /> Facility Ripon, CA. January 29, 2011. <br /> 24 Reference unavailable. <br /> 25 IT Corporation, September 11, 2000. Permanganate Pilot Study Six Month Summary Report <br /> (Revised) Former Nest16 USA—Beverage Division, Inc. Facility, Ripon, California <br /> 26 Geomatrix Consultants, April 2006. Initial Testing and Characterization Report, In Situ Groundwater <br /> Remediation Program, Former Nestle Facility, Ripon, California <br /> 27 Environmental Cost Management, Inc., March 31, 2008, Revised October 15, 2008. 2007 Annual <br /> Groundwater Monitoring Report, Nestle USA, Inc. Facility, Ripon CA. <br /> 28 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc. <br /> Facility Ripon, CA. January 29, 2011. <br /> 29 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle <br /> Facility and Surrounding Area, Ripon. <br /> 30 <br /> Environmental Cost Management, Inc., February 4, 2008. Interim Remedial Action Plan, Well <br /> Installation and Aquifer Test Report, Former Nestle USA, Inc. Facility, Ripon, California— 95366. <br /> 31 Environmental Cost Management, Inc., April 4, 2008. Industrial Avenue Facility Interim Remedial <br /> Action Plan Groundwater Extraction System Startup Report, Former Nest16 USA, Inc. Facility, Ripon, <br /> California—95366. <br /> 32 Environmental Cost Management, Inc. M-10A Investigation Report, Former Nestle USA, Inc. Facility, <br /> Ripon, California. November 30, 2010. <br /> 33 Environmental Cost Management, Inc., November 9, 2009. Re: Stockton Avenue Groundwater <br /> Extraction System Shut-down Request, Former Nestle USA, Inc. , 230 Industrial Avenue, Ripon, CA <br /> 95366. <br /> 34 Environmental Cost Management, Inc., April 15, 2010. Monitoring Well Installation Report for the <br /> Industrial and Stockton Avenue Extraction and Treatment Systems, Former Nestle USA, Inc. Facility, <br /> Ripon, California—95366. <br /> 35 Environmental Cost Management, Inc., July 7, 2010. Re: Stockton Avenue Groundwater Extraction <br /> System Shutdown Request, Former Nest/6, USA, Inc. Facility, 230 Industrial Avenue, Ripon, CA 95366. <br /> 36 Regional Water Quality Control Board—Central Valley Region, September 3, 2010. Stockton Avenue <br /> Groundwater Extraction System Shutdown Request, Former Nestle USA, Inc. Facility, Ripon, San <br /> Joaquin County. <br /> Appendix A <br /> Page A7 of A7 <br />