amec-
<br /> 8.
<br /> Management of COC-affected groundwater would be enhanced by a multi-party
<br /> approach. Cooperation between Nestle, the City of Ripon and Neenah Paper could
<br /> best protect against migration of COCs towards receptors (supply wells).
<br /> 6.0 REFERENCES
<br /> Bertoldi, G. L., Johnston, R. H., and Evenson, K. D., 1991, Ground Water in the Central Valley,
<br /> California —A Summary Report. U.S. Geological Survey Professional Paper 1401-A.
<br /> Burow, K. R., Shelton, J. L., Hevesi, J. A., and Weissman, G. S., 2004, Hydrogeologic
<br /> Characterization of the Modesto Area, San Joaquin Valley, California, Scientific
<br /> Investigations Report 2004-5232.
<br /> CDM (Camp Dresser and McKee), 2001, Water Management Plan Phase 1 — Planning
<br /> Analysis and Strategy, San Joaquin County Flood Control and Water Conservation
<br /> District, October.
<br /> ECO:LOGIC Engineering, 2005a, Hydrogeologic Evaluation, City of Ripon, California, August.
<br /> ECO:LOGIC Engineering, 2005b, Water Supply Well No. 12: Vertical Discharge and Water
<br /> Quality Profile, City of Ripon, California, December.
<br /> ECO:LOGIC Engineering, 2007, City of Ripon Effluent Disposal Percolation Study Report,
<br /> July.
<br /> Environmental Cost Management (ECM), 2006, Draft Updated Site Conceptual Model Report,
<br /> Former Nestle USA, Inc., Facility, Ripon, California, September 16.
<br /> Environmental Cost Management (ECM), 2007, Interim Remedial Action Plan for 230
<br /> Industrial Avenue, Former Nestle USA, Inc., Facility, Ripon, California, August.
<br /> Environmental Cost Management (ECM), 2008a, Interim Remedial Action Plan Well
<br /> Installation and Aquifer Test Report, Former Nestle USA, Inc., Facility, Ripon,
<br /> California, February 4.
<br /> Environmental Cost Management (ECM), 2008b, Third Quarter 2008 Site Status Report,
<br /> Former Nestle USA, Inc., Facility, Ripon, California, November 15.
<br /> Environmental Cost Management (ECM), 2008c, Interim Remedial Action Plan for the Lower
<br /> Aquifer, Former Nestle USA, Inc. Facility, Ripon, California, December 2008.
<br /> Fluor Daniel GTI, 1998, Installation and Startup Report, Soil Vapor Extraction System, Former
<br /> Nestle USA- Beverage Division, Inc., Ripon, California, November.
<br /> Geomatrix, 1996. Groundwater Flow and Transport Modeling, Nestle Beverage Company,
<br /> Ripon Facility, Ripon, California, November.
<br /> Geomatrix, 2006. Initial Testing and Characterization Report, In Situ Bioremediation Program,
<br /> Nestle Beverage Company, Ripon Facility, Ripon, California, November.
<br /> AMEC Geomatrix, Inc.
<br /> I:\Doc_Safe\9000s\9837.005\4000 REGULATORY\SCM_01.30.09\1_text\SCM Report Final.doc 54
<br />
|