Laserfiche WebLink
ENVIRONMENTAL COST MANAGEMENT,INC. <br /> Costa Mos�.California 92626 <br /> Maiw(714)662-2759 Fax:(714)662-2758 <br /> October 15, 2012 <br /> Mr. James Brownell, PG <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, CA 95670 <br /> RE: Third Quarter 2012 Site Status Report <br /> Former Nestle USA, Inc. Facility <br /> 230 Industrial Avenue <br /> Ripon, CA 95366 <br /> Dear Mr. Brownell: <br /> On behalf of Nestle USA, Inc. (Nestle), Environmental Cost Management, Inc. (ECM) <br /> prepared this Third Quarter 2012 Site Status Report for the former Nestle facility <br /> located at 230 Industrial Avenue (Site) in Ripon, California (Figure 1). This report <br /> presents the results of groundwater monitoring performed throughout the Study Area <br /> from July through September 2012. The field work completed during the Third Quarter <br /> 2012 complied with Monitoring and Reporting Program R5-2010-0810 and is <br /> summarized below. <br /> • On July 9, 2012: <br /> o ECM measured water levels in 123 wells. <br /> o Stantec, Inc. measured water levels for nine City of Ripon piezometers, 11 <br /> City of Ripon municipal wells, and three City of Ripon monitoring wells. <br /> o Lawrence & Associates measured water levels for 11 Diamond Pet Food <br /> Processor of Ripon LLC (Diamond) wells. <br /> • Between July 2 and September 11, 2012, ECM collected samples from: <br /> • Fifty eight (58) Nestle monitoring wells (26 Upper Aquifer wells, 19 <br /> Intermediate Aquifer Wells, and 13 Lower Aquifer Wells) using Passive <br /> Diffusion Bags, <br /> • Three Nestle extraction wells (EI-1, EU-3, and EU-4), <br /> • Eight City of Ripon production wells (MW-3, MW-5, MW-7, MW-9, MW-10, <br /> MW-11, MW-16, and MW-18), <br /> • Four Diamond wells (PW-6, TH-8, TH-9, and TH-10), <br /> • One private irrigation well (RPS-1), <br /> 1 <br />