Laserfiche WebLink
Table 1: Well Information <br /> Second Quarter 2014 Site Status Report <br /> Former Nestle USA, Inc. Facility, Ripon, CA <br /> Top of Casing Ground Surface Well Screened Filter Pack <br /> Well Total Depth Date <br /> Identification Drilled <br /> Well Type Well Owner Elevation Elevation Diameter Interval Interval Sampling Frequencyt <br /> (feet, msl) (feet, msl) (feet, bgs) (inches) (feet, bgs) (feet, bgs) <br /> 7501 Kiernan Ave (old) Drinking Water Supply Private 165 6 1986 NR <br /> 7501 Kiernan Ave 2008 Drinking Water Supply Private - - 343 6 210 - 230 205 - 230 8/14/2008 Treatment System - Bimonthly <br /> 7507 Kiernan Ave-Irr Irrigation Private - - 280 12 2/27/1980 A <br /> 8001 Kiernan Ave Irrigation Private - - 80 - NR <br /> (Irrigation Well <br /> Other Wells* <br /> CalTrans Irrigation State of California 70.68 69.5 150 20 90 - 150 3/20/1973 A <br /> RC-1 Drinking Ripon Christian School 64.81 63.5 205 8 161 - 194 110 - 194 8/13/1990 Q <br /> Water/Irrigation <br /> RC-2 Irrigation Ripon Christian School 63.57 62.6 160 10 50 - 135 85 - 154 1/15/1992 A <br /> RPS-1 Irrigation Ripon Public School 63.50 62.5 149 8 135 - 148 openbottom After 1945 M <br /> RPS-2 Irrigation Ripon Public School - - - - Prior to 7/1933 NR <br /> 802 Vera Avenue Drinking Water Supply Private - - - - 113 - 132 openbottom - Treatment System - Quarterly <br /> 1051 Robert Avenue Drinking Water Supply Private - - 140 - 130 - 140 Approx. 1990 M <br /> 110 Manley (a.k.a. 101 Drinking Water Supply Private - - - - - Q <br /> Manley) <br /> Notes: <br /> msl: Above mean sea level B: Biennial sampling (odd-numbered years) SA: Semi-annual sampling <br /> bgs: below ground surface A: Annual sampling M: Monthly sampling <br /> *Wells are not surveyed Q: Quarterly sampling <br /> t Reflects monitoring frequency of MRP R5-2014-0815 received by Nestle on April 28, 2014. NR: Not Required. <br /> (a)The well is destroyed/decommissioned or access to the well is not available. <br /> (b) Sample if the well is operating during the sampling event. <br /> (1)Well was originally constructed with additional screen intervals from 180-190 ft bgs and 210-220 ft bgs. These screen intervals were sealed by Neenah Paper Company in April 2009. <br /> (2)Well was originally constructed with additional screen intervals from 168-183 ft bgs and 190-210 ft bgs. These screen intervals were sealed by Neenah Paper Company in April 2009. <br /> Page 7 of 7 <br />