My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE STATUS REPORT 2015 2ND QUARTER
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
ARCHIVED REPORTS_SITE STATUS REPORT 2015 2ND QUARTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 3:10:39 PM
Creation date
2/5/2020 11:36:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE STATUS REPORT 2015 2ND QUARTER
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PDB Field Deployment Sampling Events for 20 Biennial <br /> Former Nestle USA, Inc. Facility, Ripon, CA <br /> Well Screened Length Sampling Depth of PDBs <br /> Identification Interval of Frequency" (feet,bgs) Geotracker Comments <br /> (feet,bgs) Screen fig,q,SA,Q, Circle or check when <br /> (feet) Inf/E Deployed Tether Location YIN <br /> ............ <br /> E-6 Extraction well A 145.5 first tether from top Y <br /> M-5C1 149 - 164 15 Q 161.5 bottom tether Y IS IYK ;,JL MPA <br /> M-5C2 180 - 190 10 SA 182.5 first tether from top Y fj mC <br /> M-6C1 129 - 139 10 SA 131.5 first tether from top Y hAf- <br /> M-6C2 177 - 187 10 SA 179.5 first tether from top Y Ih-lit .[t <br /> P,#- <br /> M-8C1 142 - 162 20 A 159.5 bottom tether Y 411kf16 /PC /1/)/VA <br /> M-10C1 162 - 172 10 Q 164.5 first tether from top Y f{109 /M K„ /W <br /> M-11 C 1 147 - 167 20 A 164.5 bottom tether Y 46N/r lk af, Mkl#- <br /> M-1 3A <br /> 120 - 130 10 A 127.5 2nd tether from top Y 414 w MvU4- <br /> M-16A <br /> 118 - 128 10 A 125.5 2nd tether from top y <br /> M-16C1 148 - 168 20 A 165.5 4th tether from top Y <br /> M-17C1 123 - 133 10 A 125.5 1st tether from top Y <br /> M-18C1 129 - 149 20 A 141.5 3rd tether from top Y ()' irc ,fl'1/l/�G;� <br /> M-19C1 137 - 157 20 149.5 3rd tether from top Y <br /> M-20C1 140 - 150 10 A 147.5 bottom tether y <br /> M-21C1 125 - 145 20 Q 132.5 2nd tether from top r )-Vlir AJ <br /> M-23C1 111 - 131 20 128.3 4th tether from top y <br /> M-24C1 134 - 149 15 A 136.5 first tether from top y 4I4 a ovs� Aa <br /> M-25C1 148 - 158 10 A 150.5 first tether from top Y q[1011 11'Y- w h 1r1AJ-ft <br /> M-25C2 176 - 186 10 A 183.5 2nd tether from top Y H113hr /rhe wry VO$ <br /> M-26C2 180 - 195 15 SA 187.5 2nd tether from top Y iut[(AS Oc will, r*4 <br /> 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.