Laserfiche WebLink
J & L Market, Diesel Tank, (Facility 11863) , STI-SPOOL , Febriuu :y 2020 <br /> 4 . 2 Maintenance Recommendations . <br /> 4 . 2 . 1 Foundation : <br /> Repair concrete pier . <br /> 4 . 2 . 2 Containment : <br /> Remove trash and debris from concrete dike . <br /> Seal the cracks/discontinuities in the containment with a Sherwin Williams two part <br /> Corobond Flexible Joint Sealant, Corobond Crack Filler and Corobond 100 Epoxy <br /> Primer/Sealer or equivalent . <br /> 4 . 2 . 3 Shell : <br /> None . <br /> 4 . 2 .4 Heads : <br /> None . <br /> 4 . 2 . 5 Appurtenances : <br /> None , <br /> 4 . 2 . 6 Painting/Insulation : <br /> None . <br /> 4 . 2 . 7 Piping : <br /> Install overfill prevention valve . <br /> Replace non - ferrous valves . <br /> 4 . 2 . 8 Stairways/Ladders/Walkways : <br /> None . <br /> 4 . 3 Compliance Requirements : <br /> 4 . 3 . 1 Foundation : <br /> None . <br /> 4 . 3 . 2 Containment : <br /> The distance between the shell and dike should be at least S ft . <br /> 4 . 3 . 3 Shell : <br /> The tank must have labels identifying its ID number, contents , size , and a NFPA 704 . <br /> 4 . 3 .4 Heads : <br /> None , <br /> 4 . 3 . 5 Appurtenances <br /> Ground the tank . <br /> 4 . 3 . 6 Painting/Insulation : <br /> None , <br /> 4 . 3 . 7 Piping : <br /> Install Spill Bucket , <br /> I <br /> Install Check Valve within 12 inches of the spill bucket . <br /> 4 . 3 . 8 Stairways/Ladders/Walkways : <br /> None . <br /> t <br /> 8 <br />