Laserfiche WebLink
KLEINFEL©ER <br />[ f <br /> I <br /> f � <br /> ATTACHMENT A <br /> KLEINFELDER FIELD PROFTOCOL <br /> 4 <br /> A-1 FIELD PREPARATION <br /> Before performing work in the field, environmental staff will review the scope of work <br /> prepare a health and safety plan, coordinate the: work Into be done with their supervisor, <br /> assemble the necessary sample containers, and check, calibrate and clean equipment to be used <br /> in the field:. Underground Service Alert (USA) also is contacted prior to work with the boring <br /> locations and the scheduled date of drilling, or a utility locating firm is employed to check the <br /> boring locations. <br /> A-2 DRILLING AND SUBSURFACE SOIL SAMPLING� E <br /> A-2.1 Drilling <br /> Soil borings are advanced using a truck-mounted drill rig,'�equipped with hollow stem augers. <br /> Subsurface soil samples are collected from the soil borings. During drilling, an experienced <br /> environmental geologist classifies the soil, logs the stratigraphy of the borings, and collects <br /> soil samples. <br /> k <br /> A-2.2 Qualitative Field Screening .4 <br /> An organic vapor detector, such as a Photovac TIP, using a photo-ionization detector (PID) or <br /> a Foxboro flame-ionization detector (FID), is used to provide a qualitative screening of each <br /> soil sample: collected from the borings. The organic vapor detector measures ionizable <br /> compounds in the air in parts per million by volume (pprriv). Field calibration is .performed <br /> using a calibrated span gas. Ambient air is used to set, the instrument to zero. The soil <br /> contained in the cone of the sampler or in a brass tube Itis exposed and screened 'with the <br /> organic vapor detector. The vapor reading is noted as the field screening result. <br /> � I <br /> For the protection of the drilling crew, the organic vapor detector also is used to measure the <br /> volatile concentrations in the breathing zone prior to and 'iduring the drilling of the borings. <br /> Total ionizable hydrocarbon readings in excess of 1 ppmv may necessitate respiratory <br /> protection for th'e affected crew members. This requirement is included in the complete field <br /> health and safety plan developed for the project prior to the'start of field work. <br /> i <br /> A-2.3 Collection of Soil.Samples f I <br /> Soil samples are collected approximately every 5 feet for field screening, lithologic logging, i <br /> and possible analytical analysis. Samples are collected by advancing the boring to a point <br /> immediately above the desired sampling depth and then driving (vertical borings) or pushing <br /> (slant borings) ;a Modified California Sampler, lined 'with three brass tubes, into the <br /> undisturbed soil.. The sampler is then removed from the bbttom of the boring. The ends of <br /> the bottom (third) tube are covered with Teflon and sealed with tight fitting plastic caps. <br /> Each sample is individually labeled. The label includes KI infelder's name, job number, the <br /> date and time the sample was collected, the employee number of the individual who performed <br /> the sampling, and a unique five-digit sample identification'i�number. A custody seal may be <br /> placed on the sample in such a way that any attempt to ',itamper with the sample is easily <br /> visible. <br /> 24-YP2512/JA5-2731993) Page A-1 <br /> Copyright 1993 Kteinfetder, Inc. September 10, 1993 <br /> s . <br />