My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
540
>
2900 - Site Mitigation Program
>
PR0503732
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:16:46 PM
Creation date
2/5/2020 2:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503732
PE
2950
FACILITY_ID
FA0005952
FACILITY_NAME
BRANNON TIRE
STREET_NUMBER
540
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906028
CURRENT_STATUS
02
SITE_LOCATION
540 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Audit Services, Inc. <br /> Environmental Professionals <br /> vP1803 W.March Lane,SuiteA•Stockton,CA95207•(209)956-0264 FAX(209)956-0700 <br /> ••- <br /> November 9, 1993 <br /> (GeoAudit 820-S) <br /> Mr. Steve Sasson <br /> San Joaquin County PHS/EHD <br /> P. O. Box 2009 l <br /> Stockton, CA 95201 <br /> Subject: Brannon Tire (Wagner Corporation) <br /> 540 North Hunter, Stockton, California ENVi,iPONfv1!_i1;TA, .-LA H <br /> PL'l !`A1/5E!-V1CLS <br /> Dear Mr. Sasson: <br /> Enclosed, please find the permit for drilling two soil borings at <br /> the referenced site. V & W Drilling will be providing the drill rig <br /> and two-man crew. Details of the drilling and sampling are included <br /> in the Site Contamination Work Plan (October 1993) previously <br /> submitted to your office. <br /> The work plan call for the analysis of two (2) soil samples for TPH <br /> as gasoline and BTE&X. Pursuant to our telephone conversation, the <br /> samples will also be analyzed for TPH as diesel using the <br /> appropriate EPA method and method detection limits. The samples <br /> will be analyzed by a state-certified laboratory (either Alpha <br /> Analytical Laboratories, McCambell Analytical or Western <br /> Environmental Science and Technology) . <br /> GeoAudit has tentatively scheduled the drilling to begin at 9: 00 am <br /> on Wednesday, November 17 , 1993 . If you have any additional <br /> questions or comments, please contact our office. <br /> Sincerely, <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> Z� <br /> Bob Marty <br /> Project Manager <br /> cc: Mr. Tim Gill - Wagner Corporation <br /> Full Spectrum Environmental Services • Hydrogeology <br />
The URL can be used to link to this page
Your browser does not support the video tag.