Laserfiche WebLink
PARKING GARAGE Page 1 of 2 <br /> Path to Closure Plan — © GEOTRACKER HOME I MANAGE PROJECTS IP_P03T3I SEARCH I LOGOUT <br /> PARKING GARAGE (TO607700689) - MAP THIS SITE OPEN- SITEASSESSMENT <br /> 130 HUNTER STN CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON , CA 95205 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP (LEAD) - GASEW: 1150 <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CASEWORKER: VICKI MCCAR SUPERWSOMADRIENNEELLSAESSER <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SUE CENTRAL VALLEY RWOCR (REGION 5S) - CASE 0.. 390082 <br /> CASEWORKER: JAMES MR TON - SUPERVISOR: CORI CONDON <br /> CUP Claim A: 15631 CUE Priority Assigned D CUE Amount Pala:£ <br /> THIS PROJECT WAS LAST MODIFIED BY NUEL HENDERSON ON 62 012 014 11:04:50 AM -HISTORY <br /> THIS SITE HAS SUBMITTALS. CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan MIS VERSION IS FINAL AS OF 6/202014 PATH TO CLOSURE HIS CLEAR I RESET PATH TO CLOSURE PUN <br /> IMPEDIMENT 1 : <br /> General Criteria E: A conceptual site model that assesses the nature, extent and mobility of the release r Procedural Impediment - IGEo <br /> has NOT been developed No Funding <br /> - DATE RESOLVED <br /> Step to Resolve Impediment l - St 1: - DELETE STEP COMPLETION DATE <br /> Submit a work n to complete the delineation of the vertical and lateral extent of impacted soil aa. <br /> groundwater . ROJECTED DAMACTUAL DATE <br /> 12302014 �— <br /> Step to Resolve Impediment l - Ste 2: - DELETE STEP COMPLETION DATE <br /> Implement site assessment work plan. PROJECTED DATE ACTUALDATE <br /> 63tV�15 I �— <br /> P2 to Resolve Impediment l - Ste DELETE STEP <br /> COMPLETION DATE <br /> imbelt report of findings and recommendations and include the conceptual site model <br /> PROJECTED DATE rACTUAL DATE <br /> 92fll2015 I <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable C Procedural Impediment - INEo <br /> No Funding <br /> GATE RESOLVED <br /> Stop to Resolve Impediment 2 - Ste 1 : - DELETEs COMPLETION DATE <br /> Re-install ing w t his site and any additional wells needed to adequately characterize the <br /> plume ofPR <br /> impacted groundwater. DALE <br /> fi/JN2015 �j <br /> Step to Resolve Impediment 2 - Ste 2: DELETE STEP- <br /> COMPLETION DATE <br /> ing wells . <br /> LM1e reinstalled monitoring <br /> PROJECTED DATE <br /> Sample r <br /> N30.2m5 F <br /> step to Reealve lm diment 2 - MO 3: - DELETE STEP COMPLETION DATE <br /> Prepare a Corrective Action Plan. <br /> PROJECTED DAIS ACTUAL DATE <br /> 12/302015 <br /> Map to Resolve Impediment 2 - Ste 4: -DELETE STEP <br /> COMPLETION DATE <br /> ni dna complete remediation, of necessary. <br /> Implement co Tete sax . <br /> PROJECTED DA CTUALDATE <br /> 6I3U/Y11] I <br /> ADO ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Medla-SDecific Criteria: Groundwater: The contaminant plume that exceeds water quality objectives is C Procedural Impediment - Irmo <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of No Funding <br /> the five classes of sites. - - - - -- <br /> DAM RESOLVED <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length (That Exceeds Water Quality Objectives): Unknown <br /> • Plume is Stable or Decreasing In AREAL Extent: Unknown <br /> • Benzene Concentration: 2i 1,000 pgil and < 3,000 pgh <br /> • Nearest Surface Water Body (From Plume Boundary): > 250 Feet and 51,000 Feet <br /> Step to Resolve Impediment 3 - Ste 1: - DELETE STEP COMPLETION DATE <br /> Install Previously approved monitoring wallet one boring, and any additional wells needed to complete <br /> the plums delineation. ppTTttpp�LDATE <br /> vR N3N2D1S <br /> Step to Resolve Impediment 3 - Step 2: - DELETE STEP COMPLETION DATE <br /> https://geotracker.waterboards.ca. gov/regulators/screens/closure_policy.asp?global_id=TO. . . 6/20/2014 <br />