Laserfiche WebLink
I <br /> Lu <br /> Lu <br /> W <br /> N Y <br /> J <br /> W <br /> z <br /> 7 CO <br /> S <br /> F <br /> MW-4 <br /> 0 <br /> z <br /> SB-y <br /> SB-11 t <br /> +SB-4 <br /> \ N*TP-C <br /> FORMER UST MW- 1 \ FORMER PUMP INTERIOR OF <br /> EXCAVATION i ---I STATION BUILDING <br /> AREAS I i TP-A <br /> MW-3 <br /> I <br /> SB-2 ♦ ` MW-2 <br /> —' TP-B <br /> DIRECTION OF <br /> GROUNDWATER FLOW <br /> +SB-5 <br /> +G-4 G-5 <br /> EXPLANATION <br /> Approximate location of 60-foot deep boring <br /> Approximate location of proposed 60-foot deep boring <br /> -�- Approximate location of 10-foot deep test pit <br /> Approximate location of existing groundwater monitoring well and <br /> TPI-Ig concentrations in August 2004 <br /> Approximate location of groundwater sampling borings and <br /> TPHg concentrations in March 2004 0 10 20 Feet <br /> ------ -- Approximate location of former fuel line <br /> Approximate scale <br /> s <br /> a 130 NORTH HUNTER STREET SITE PLAN AND <br /> Stockton, California PROPOSED BORING LOCATIONS <br /> °' - - — - - ---°i�� — Date 12/08/04 Project No. 2597. 11 Figure 2 <br /> n <br />