Laserfiche WebLink
W <br /> W <br /> U) J <br /> W <br /> z w <br /> 2 D <br /> 2 U) <br /> 2 <br /> *MW-4 <br /> O TPHg <br /> z <br /> ND <br /> SB-11 <br /> � SIB-4� <br /> FORMER UST MWm FORMER PUMP INTERIOR OF <br /> EXCAVATION i -- -i TPHg STATION BUILDING <br /> AREAS i i 8,800 <br /> SB-3 * <br /> MW-3 <br /> TPHg <br /> MW-2 26,000 <br /> TPHgy DIRECTION OF <br /> SB-5* <br /> SB-2 ♦ 30,000 GROUNDWATER FLOW <br /> G-4 G-5 <br /> -TPHg TPHg <br /> ND ND <br /> EXPLANATION <br /> Approximate location of proposed 30-feet deep boring <br /> Approximate location of proposed 6 to 10-foot test pit <br /> Approximate location of existing groundwater monitoring well and / <br /> TPHg concentrations in August 2004 <br /> {�} Approximate location of groundwater sampling borings and <br /> �r TPHg concentrations in March 2004 <br /> - - - - - -- - Approximate location of former fuel line 0 10 20 Feet <br /> ND Analyte not detected <br /> Approximate scale <br /> 3 TPHg Total Petroleum hydrocarbons as gasoline <br /> a 130 NORTH HUNTER STREET SITE PLAN , RECENT ANALYTICAL DATA <br /> Stockton , California AND PROPOSED BORING LOCATIONS <br /> N <br /> Tree %W rib Date 11 /04/04 Project No. 2597. 11 Figure 2 <br />