My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2900 - Site Mitigation Program
>
PR0505148
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:12:43 PM
Creation date
2/5/2020 2:50:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0505148
PE
2950
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By : Ramage Environmental ; 916 354 1786 ; Mar - 2 ' -'Q4 5 : 5BPM ; Page 5 <br /> Physical Hazards : These hazards are primarily associated with onsite equipment and he <br /> general nature of construction work. Please refer to the attached Physical Hazard Analys s <br /> Sheets for controls. <br /> X Heat X Slip, Trip, Fal] Excavations/Tre hes <br /> Cold X Noise X Moving Equipment <br /> Rain X Underground Hazards X Traffic <br /> Fog Overhead Hazards Other: <br /> Level of Protection: Q A ❑ B ❑ C 19 D <br /> Modifications: Modifications to levels of protection shall be made by the SSO based on <br /> air monitoring results. <br /> Site Entry Procedures : The site will be entered from North Hunter Street. <br /> Site Control Measures: Unauthorized personnel will not be allowed in the work at ea. . No <br /> eating, drinking or smoking in the work area. The Field Supervisor shall enforce these measures <br /> and buddy system, PPE and training requirements for all on site personnel. Spills are nc t <br /> expected to be a concern on the project. However, if a spill is to occur, adsorbent mater als are <br /> available. <br /> A tailgate safety meeting will be held by the SSO for all site personnel . The safety discussion <br /> will include, in addition to other items in this Health and Safety Plan, the following issu s: <br /> + Site personnel will execute proper lifting techniques for heavy items. T <br /> he <br /> maximum weight to be lifted by any site personnel should not exceed 60 .lbs. <br /> The drill rig shall be inspected prior to operation by the drill crew and S O. <br /> An exclusion zone shall be secured around the work area. <br /> + Fire extinguisher, first aid kit, eye wash, and hospital route map shall be staged for <br /> easy access during drilling activities. <br /> Onsite personnel shall contact the SSO with any Health and Safety issues, <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.