Laserfiche WebLink
Sent By : Ramage Environmental ; 916 354 1786 ; Mar - 2 ' -'Q4 5 : 5BPM ; Page 5 <br /> Physical Hazards : These hazards are primarily associated with onsite equipment and he <br /> general nature of construction work. Please refer to the attached Physical Hazard Analys s <br /> Sheets for controls. <br /> X Heat X Slip, Trip, Fal] Excavations/Tre hes <br /> Cold X Noise X Moving Equipment <br /> Rain X Underground Hazards X Traffic <br /> Fog Overhead Hazards Other: <br /> Level of Protection: Q A ❑ B ❑ C 19 D <br /> Modifications: Modifications to levels of protection shall be made by the SSO based on <br /> air monitoring results. <br /> Site Entry Procedures : The site will be entered from North Hunter Street. <br /> Site Control Measures: Unauthorized personnel will not be allowed in the work at ea. . No <br /> eating, drinking or smoking in the work area. The Field Supervisor shall enforce these measures <br /> and buddy system, PPE and training requirements for all on site personnel. Spills are nc t <br /> expected to be a concern on the project. However, if a spill is to occur, adsorbent mater als are <br /> available. <br /> A tailgate safety meeting will be held by the SSO for all site personnel . The safety discussion <br /> will include, in addition to other items in this Health and Safety Plan, the following issu s: <br /> + Site personnel will execute proper lifting techniques for heavy items. T <br /> he <br /> maximum weight to be lifted by any site personnel should not exceed 60 .lbs. <br /> The drill rig shall be inspected prior to operation by the drill crew and S O. <br /> An exclusion zone shall be secured around the work area. <br /> + Fire extinguisher, first aid kit, eye wash, and hospital route map shall be staged for <br /> easy access during drilling activities. <br /> Onsite personnel shall contact the SSO with any Health and Safety issues, <br /> 4 <br />