Laserfiche WebLink
'rl <br /> Sent By : Ramage Environinental ; - 916 354 1786 ; Mar - 2' 04 5 : 58PM ; Page 7 / 10 <br /> f <br /> i <br /> Emergency Response Pian : Due to the nature of this work, it is not anticipated that a <br /> catastrophe (e.g. , explosion, fire, etc.) will occur. However, in case of an emergency, thc. SSO <br /> shall ensure that all personnel working at the site shall know at a minimum the following <br /> evacuation procedures : <br /> i <br /> 1 . If evacuation is necessary, all personnel will proceed to a predetermined location in the <br /> support zone, upwind and upslope (as necessary) of the work zone. <br /> THE SIGNAL FOR EVACUATION WILL BE 3 SHORT BLASTS IN <br /> SUCCESSION ON AN AIR OR CAR HORN. <br /> 2 . Site-specific evacuation incident procedures will be discussed and documented by the <br /> SSO . <br /> 3 , Any person requiring medical attention shall be evacuated promptly from any <br /> contaminated area. For personnel requiring medical attention, the emergency information <br /> guidelines attached shall be followed . <br /> Onslte Monitoring Required ? 0 Yes O No <br /> If yes, specify equipment: A photo ionization detector (PID) will be used initially an during <br /> drilling activities as required to insure safety. Any sustained readings above 25 part per million <br /> (ppm) in the breathing zone will require upgrading to level C protection. Readings gust fined <br /> above 250 ppm will require the operation to be stopped and local Health and Safety to <br /> contacted. <br /> Site Personnel• <br /> NAME TITLE RESPONSIBILITY <br /> 1 . <br /> 2 , <br /> 3 . <br /> 4 . <br /> 5 . <br /> b. <br /> 7. <br /> 6 <br />