Laserfiche WebLink
f 1 <br /> Ground <br /> surface <br /> Bentonite chips from <br /> ground surface to 0.5 <br /> feet below ground surface. <br /> I <br /> 2-inch Diameter Borehole <br /> 3/4-inch Diameter PVC <br /> .r <br /> 10-foot Length Screen <br /> Threaded Bottom Cap <br /> Figure 1 <br /> Proposed Short-Term Well Construction Details <br /> Kinder Morgan Energy Partners- <br /> Stockton Junction Site <br /> 174008.A1.01 ProposedW.11 Cmr.=n Mjl 8118/02 SFO - CH2MHILL <br />