Laserfiche WebLink
VoLUE,?C,SLMi.FGSCOXST <br /> Daily Field Report <br /> ' 10/14/2008 <br /> ERI: 2666 Chevron 100-1621 <br /> N 37045.098 <br /> ' W 121020.887 Elev.: V <br /> PM: Dave Klemme <br /> Tech: CTW <br /> ' Comments: System is down (shut down 10/3/08) for compressor <br /> repairs. <br /> ' • Checked in with Chevron @ 1230. Parked truck in compound and <br /> backed into parking spot, and coned off truck. <br /> Rebuilt the vanes in the air compressor and tested it. <br /> Contacted David Evans to let him know we need to program the <br /> Skymetry unit to accept the new input for the low pressure switch <br /> ' (it is wired into input #4). <br /> Monitored the system <br /> ' Hours = 24,679 <br /> Compressor pressure = 11.0 psi (zone 3) <br /> ' Compressor temp= 110°F <br /> Flow= 10 scfm <br /> ' System was running on departure @ 1530 <br /> t <br />