My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6787
>
3000 – Underground Injection Control Program
>
PR0518315
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:42:51 PM
Creation date
2/5/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0518315
PE
3030
FACILITY_ID
FA0013829
FACILITY_NAME
KOOYMAN DAIRY/ LAB CLEAN UP
STREET_NUMBER
6787
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
6787 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Koo man PropeM. <br /> Job Location: 6781-6787 E. Jahant Road Acam o <br /> Client Name: Mike Kooyman <br /> Project Number: 02-479 <br /> General Work Description: Collect soil samples from backhoe bucket beneath leach lines. <br /> Collect water samples from drums and from septic tank <br /> SSP Prepared by: Sean Garvey <br /> On-site Safety Officer: Sean Garvey <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZ4 at the job site. All personnel working for GZA at the job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If <br /> changes in site or working conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the <br /> written approval of the GZA Health and Safety Director. <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.