Laserfiche WebLink
r T <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> :;....Hazard Mat+ atior�Measure <br /> ask(sl :> .......... 9... <br /> 1,2 Heavy Equipment Moise & Physical All heavy equipment used on this project will be in <br /> contact) good working order and operated in accordance <br /> with recognized industry standards and Cal-OSHA <br /> Title S, Subchapter 4, Construction Safety Orders. <br /> In addition, an exclusion zone applies to all <br /> personnel. The exclusion zone will be 20 feet to <br /> the front and either side of the operating drill rig. <br /> Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1,2 bust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will be <br /> applied to control the dust if visible levels of dust <br /> are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> materials. <br /> I <br /> Flamnaabie (Flash Port. C10Q °F) '', Gorribustitite 4Flesh Point ".20D <br /> I <br /> Toluene <br /> f <br />! <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> t <br /> Dry chemical fire extinguishers, Class A B and C are stored in all GZA vehicles. <br /> t <br /> 1 <br /> PAGE 5 <br />