My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
4505
>
2900 - Site Mitigation Program
>
PR0523363
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:24:31 PM
Creation date
2/5/2020 4:31:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523363
PE
2965
FACILITY_ID
FA0015787
FACILITY_NAME
SIERRA HILLS PACKING
STREET_NUMBER
4505
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08917052
CURRENT_STATUS
01
SITE_LOCATION
4505 4799 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL <br /> NEIL O. ANDERSON ENVIRONMENTAL <br /> AN D ASSOCIATES INSPECTIONS a TESTING <br /> LABORATORY SERVICES <br /> POOL ENGINEERING <br /> POST TENSION DESIGN <br /> October 1, 2004 <br /> NOA Project Number: LE03-034 <br /> GROUND WATER QUALITY INVESTIGATION WORKPLAN <br /> CHINCHIOLO STEMILT CALIFORNIA, LLC <br /> & SIERRA HILLS PACKING, INC. <br /> 4799 & 4505 NORTH JACK TONE ROAD <br /> STOCKTON, CALIFORNIA 95215 <br /> Neil O.Anderson &Associates, Inc. (NOA) has been retained by Mr. Tom Chinchiolo of <br /> Chinchiolo Stemilt California, LLC and Sierra Hills Packing, Inc. (CSC/SHPI) to assist in <br /> preparation of Report of Waste Discharge for a revised description of the discharge source for their <br /> cherry, apple, and pear packing facilities located at 4799 and 4505 North Jack Tone Road Stockton, <br /> California. <br /> According to the California Water Code Section 13267, administered by the Central Valley Regional <br /> Water Quality Control Board (Board), the owners of the CSC/SIIPI facilities at Jack Tone Road <br /> Stockton, California (hereinafter referred to as Facility) are required to comply with the Order for <br /> Technical Reports letter dated August 26, 2004 (Order.) This Ground Water Quality Investigation <br /> Workplan (workplan) is one of the reports required by the Order. <br /> The following workplan is for the proposed investigation of groundwater quality at the Facility. It <br /> is proposed to investigate existing ground-water quality both up-gradient and down-gradient of the <br /> land application area and wastewater pond through the installation and sampling of four ground <br /> water monitoring wells. <br /> This workplan has been prepared by a California Certified Engineering Geologist as required by the <br /> Board. <br /> The monitoring well installation work plan presented herein has been adapted from an outline of a <br /> typical workplan provided by the Board. The workplan is organized into the following sections: <br /> general information, drilling details, monitoring well design,well development, survey details,well <br /> sampling,water level measurements,and proposed time schedule for work. <br /> LODI ■ SACRAMENTO ■ MODESTO <br /> ENVIRONMENTAL DIVISION 902 Industrial Way,Lodi,California 95240 !209.367.3701 ■ 209.369.4228 faa ■www.noandusmcom <br />
The URL can be used to link to this page
Your browser does not support the video tag.