Laserfiche WebLink
1 i • <br /> GEOTECHNICAL <br /> 1 I NEIL O. ANDERSON ENVIRONMENTAL <br /> A N D A S S O C I A T E S INSPECTIONS d TESTING <br /> 1 LABORATORY SERVICES <br /> POOL ENGINEERING <br /> POST TENSION DESIGN <br /> 1 October 1, 2004 <br /> NOA Project Number: LE03-034 <br /> 1 <br /> GROUND WATER QUALITY INVESTIGATION WORKPLAN <br /> 1 CHINCHIOLO STEMILT CALIFORNIA,LLC <br /> 1 & SIERRA HILLS PACKING, INC. <br /> 4799 &4505 NORTH JACK TONE ROAD <br /> 1 STOCKTON, CALIFORNIA 95215 <br /> 1 <br /> Neil O. Anderson&Associates, Inc. (NOA) has been retained by Mr.Tom Chinchiolo of <br /> 1 Chinchiolo Stemilt California,LLC and Sierra Hills Packing, Inc. (CSC/SHPI) to assist in <br /> preparation of Report of Waste Discharge for a revised description of the discharge source for their <br /> cherry, apple, and pear packing facilities located at 4799 and 4505 North Jack Tone Road Stockton, <br /> 1 California. <br /> According to the California Water Code Section 13267, administered by the Central Valley Regional <br /> 1 Water Quality Control Board (Board), the owners of the CSC/SHPI facilities at Jack Tone Road <br /> Stockton, California(hereinafter referred to as Facility) are required to comply with the Order for <br /> Technical Reports letter dated August 26, 2004 (Order.) This Ground Water Quality Investigation <br /> 1 Workplan (workplan) is one of the reports required by the Order. <br /> The following workplan is for the proposed investigation of ground water quality at the Facility. It <br /> 1 is proposed to investigate existing ground-water quality both up-gradient and down-gradient of the <br /> land application area and waste water pond through the installation and sampling of four ground <br /> water monitoring wells. <br /> 1 This workplan has been prepared by a California Certified Engineering Geologist as required by the <br /> Board. <br /> 1 The monitoring well installation work plan presented herein has been adapted from an outline of a <br /> typical workplan provided by the Board. The workplan is organized into the following sections: <br /> 1 general information, drilling details, monitoring well design,well development, survey details,well <br /> sampling,water level measurements, and proposed time schedule for work. <br /> 1 LODI ■ SACRAMENTO ■ MODESTO <br /> 1 ENVIRONMENTAL DIVISION 902 Industrial Way,Lodi,California 95240 ■209.367.3701 0 209.369.4228 fax ■w .noandeisonxom <br />