Laserfiche WebLink
1 i <br /> iOctober 1,2004 <br /> NOA Project Number: LE03-034 <br /> I9.0 WELL CONSTRUCTION AND MONITORING REPORT <br /> 1 A report will be prepared to present the well construction details and analytical test <br /> results for the four (4) monitoring wells. The report will describe the drilling <br /> activities, soil conditions encountered, first encountered ground water, <br /> estimated ground-water gradient computed from the four monitoring wells, and both field and <br /> laboratory test results. The report will also include the:well soil logs, construction diagrams, and <br /> laboratory test result sheets. <br /> 10.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This Ground Water Quality Investigation Workplan has been prepared under the supervision and <br /> direction of the undersigned. <br /> Clifford Walker,Jr. <br /> R.E.A. 1-00797 <br /> Project Manager <br /> QED GEO< <br /> W No. 2,51 y a <br /> Mo <br /> ' CERTIFIED • <br /> J. Welch,M.Sc. Et4r EFING <br /> CEG-2151, CHG-653, GP-1049 s GEpIOG�sT � <br /> Environmental Department Manager �9 SFO <br /> �OF CPL <br /> ' 11 <br />