My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003165
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
819
>
2900 - Site Mitigation Program
>
PR0522087
>
ARCHIVED REPORTS_XR0003165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:18:56 AM
Creation date
2/6/2020 8:20:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003165
RECORD_ID
PR0522087
PE
2960
FACILITY_ID
FA0015049
FACILITY_NAME
UNIFIRST CORP
STREET_NUMBER
819
Direction
N
STREET_NAME
HUNTER
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
819 N HUNTER
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TI GENERAL INFORMATION <br /> 1 Obtain an EPA Site Number from the Department of Toxic Substances Control(800) 61-TOXIC for temporary <br /> hazardous waste removal activities associated with underground storage tank(UST) removals <br /> i2 Disposal Information SJC EHD's Underground Storage Tank Disposition Tracking Record(UST Tracking Record, <br /> page 10)shall accompany each tank removed from site Tank(s)will be issued an identification number which EHD's <br /> ' representative will note on the UST Tracking Record Contractor will affix same identification number onto tank end <br /> using fluorescent spray paint Contaminated tanks and/or piping are to be transported under Hazardous Waste <br /> Manifest by a state registered hazardous waste hauler <br /> 3 Contractor to Provide Combustible/Flammable gas detector(to verify the Lower Explosive Limit(LEL) atmosphere <br /> and oxygen level of tank prior to lifting from excavation),adequate number(s) and appropriate type(s)of fire <br /> extinguisher(s),barriers to secure the area as necessary to minimize traffic and pedestrian interference,and fluorescent <br /> spray paint to affix tank identification numbers It shall be the project manager's responsibility for compliance with all <br /> health&safety regulations and requirements,which shall be strictly adhered to at all times during the course of the <br /> closure activities <br /> 4 The EHD permit shall be on site during tank excavation and removal <br /> 5 Any changes in this document shall be approved by EHD prior to initiating work <br /> ' 6 Closure-in-Place If Closure-in-Place is the suggested method of abandonment,complete form <br /> EH 23 039 and submit written approval from the local Fire Department <br /> 7 Temporary Closure If Temporary Closure is the suggested method of abandonment, complete <br /> and submit this form and a written approval from the local Fire Department <br /> M8 The following documentation shall be submitted within 30 days of the tank removal date: <br /> a) Analytical results,mailed directly from laboratory to EHD,including a chain of custody and quality assurance <br /> ' and quality control(QA&QC) <br /> b) UST Tracking Record Sheet(s)and/or Tank Hazardous Waste Manifest(s) <br /> ' c) Tank Closure Certification Form(DTSC form 1249) <br /> d) Hazardous Waste Manifests for piping, rinsate,residual fuel, or waste oil receipt <br /> RM <br /> e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated City <br /> Building Departments This report will be referred to the appropriate agency for their review <br /> ' A site which has had UST(s) removed,shall not be considered for final closure until the above items are <br /> submitted for review <br /> III SITE MITIGATION <br /> I In the event contairunation is observed,confirmed or suspected as a result of a leaking UST system it is the <br /> ' responsibility of the owner or operator to submit a work plan to EHD Site Mitigation Unit and have it approved prior <br /> to initiating any assessment or remediation activities To minimize delays, the work plan may be submitted concurrent <br /> with tank closure or installation plans Address one copy of the work plan to the Site Mitigation Unit for review If the <br /> site is not currently in the Local Oversight Program,a billing form and a$267 minimum fee must be submitted with the <br /> workplan For further assistance contact the Site Mitigation Unit at(209)468-3450 <br /> DH 23 046 (Revised 3115102) Page 2 <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.