My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003165
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
819
>
2900 - Site Mitigation Program
>
PR0522087
>
ARCHIVED REPORTS_XR0003165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:18:56 AM
Creation date
2/6/2020 8:20:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003165
RECORD_ID
PR0522087
PE
2960
FACILITY_ID
FA0015049
FACILITY_NAME
UNIFIRST CORP
STREET_NUMBER
819
Direction
N
STREET_NAME
HUNTER
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
819 N HUNTER
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMI !G PROTOCOL FOR ROUTINE TANK REL JALS <br /> The following represents minimum sampling criterion required for closure compliance Soil samples collected shall be representative <br /> of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2-4 feet If containination is documented <br /> during closure,an Unauthorized Release Notification must be completed and submitted within five(5)working days pursuant to <br /> California Health&Safety Code, Section 25295 <br /> ' WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000- 10,000 2 per Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> ' PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sam le every 20 lineal feet <br /> TANK&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> ' < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater 1 <br /> interface& 1 below tank <br /> 4 from wall next to tank <br /> ' > 10,000 OR ends at soil groundwater <br /> Tank Cluster 5 or more interface& 1 below each I <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> I Soil samples shall be obtained beneath the slab within native soils Penetration through the obstruction will be required in order to <br /> collect the samples (Physical removal of the obstruction will allow sampling according to the above conditions) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 perTank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> 1 <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced 6 <br /> along the length of the Tank <br /> ' EH 23 046(Revised 3/15/02) Page 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.