Laserfiche WebLink
' EEC S4114 Unifirst Stockton Au ust 8,2002 <br /> Project Schedule <br /> EEC has prepared the following aggressive schedule for implementation of site investigation and <br /> ' remediation The schedule is based on the assumption that the lateral and vertical extent of <br /> hydrocarbon-impacted soil that is required or is necessary to be removed is relatively minor, does <br /> not exceed 1,000 cubic yards, and does not extend within 5 feet of groundwater <br /> _ � <br /> ID Task Mame "Stam_- _ �1msh Dumbon <br /> - 4 a 9 10 11 12 M 14 15 18 17, 18 19 20 21 <br /> 1 Submit Workplan To SJCDEH 8/9102 "102 1d <br /> 2 Submit UST Removal Application 8/12102 8112102 1d - <br /> ' 3 Complete Excavation of Test Pits 8/12102 8112/2002 1d <br /> 4 Approval of Workplan by SJCDEH 8!12102 8/1212002 1d <br /> 5 Remove UST(s) 8114102 8!75!02 2d _ <br /> ' <br /> 6 in Delineation and Excavation OF <br /> drocarbon-Impacted Sod 8113102 8115!2002 3d <br /> 7 Confirmation Soil Testing 8115102 8/15/2002 1d . <br /> ' 8 Laboratory Analyses of Soil Samples 8115X02 8116102 2d _ <br /> 9 Loading and ransporiabon Impacted Sods 8119/02 8/1912002 1d - <br /> ' Closing <br /> Discovery of hydrocarbon-impacted soil and pipelines likely related to former petroleum USTs <br /> have resulted in work stoppage at a mayor development project at the site referenced above The <br /> work scope proposed in this document is intended to provide a rapid response to this recent <br /> discovery in accordance with all regulations and requirements of the SJCDEH EEC appreciates <br /> in advance your assistance and guidance with implementation of this workplan, and looks <br /> ' forward to working with your agency at the subject site Please call Mark Zeko at (714) 667- <br /> 2300 if you have any questions or comments <br /> ' Sincerely, <br /> EEC <br /> It <br /> Mark Zeko, R G , C HG <br /> Vice President <br /> 1 <br />