My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:11:48 AM
Creation date
2/6/2020 8:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524672
PE
2965
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C C-2 <br /> MONITORING WELL WORKPLAN AND <br /> MONITORING WELL INSTALLATION REPORT GUIDANCE <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Describe what well features will be surveyed(i.e.top of casing, horizontal and vertical <br /> coordinates, etc.) <br /> Vertical accuracy shall be to at least 0.01 foot <br /> F. Well Sampling: <br /> Minimum time after development before sampling(48 hours) <br /> Well purging method and amount of purge water <br /> Sample containers,collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> QA/QC procedures <br /> G. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.01 foot. <br /> Method and time of water level measurement shall be specified. <br /> H. Proposed time schedule for work. <br /> SECTION 2—Groundwater Sampling and Analysis Plan <br /> A. General Information: <br /> Site Location <br /> Monitoring well locations <br /> Monitoring well construction details including elevation, well depth, casing material and size, <br /> and screen interval <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing wells, proposed wells, waste handling facilities, <br /> utilities, and other major physical and man-made features. <br /> B. Water Level Measurement: <br /> Ground surface elevation at each monitoring well shall be within 0.01 foot. <br /> Method and time of water level measurement shall be specified <br /> Water level in well shall be allowed to equilibrate prior to measuring the depth to water <br /> C. Well Sampling: <br /> Well purging method and amount of purge water, purge water storage <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> Identification of analytical laboratory <br /> Chain of custody procedures <br /> QA/QC procedures <br /> D. Proposed time schedule for work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.