Laserfiche WebLink
Mr. Jeffrey Palumbo - 3 - 15 November 2005 <br /> 10. Title 27 §21750 (f) Geology. A generalized geologic map of California was provided. A map of <br /> the site specific geology needs to be provided. <br /> 11. Title 27 §21750 (f)(1) Geology-Map and cross sections. A boring log does not suffice for this <br /> requirement. A cross section portraying the pond design, underlying geology and groundwater <br /> shall be provided. <br /> 12. Title 27 §21750 (f)(2), (3) and(4) Geology. Provide a more detailed discussion of the geology <br /> with relation to the pond design and construction. The ponds shall be constructed such that <br /> underlying shallow groundwater will be protected. The Geotechnical Report focused primarily <br /> on the construction of the pump station, reservoir and brine concentrator not on the evaporation <br /> brine ponds. <br /> 13. Title 27 §21750 (5) Geology-Stability Analysis. A stability analysis shall be performed <br /> specifically for the evaporation ponds and include the items detailed in Title 27 §21750 <br /> (5)(A)(B)(C). <br /> 14. Title 27 §21750(g) Hydrogeology. The information as outlined in this section needs to be <br /> provided(i.e. hydraulic conductivity and groundwater flow). <br /> 15. Title 27 §21750(g)(7) Background. Please provide proposed monitoring plans for groundwater <br /> detection monitoring, surface water monitoring and vadose zone monitoring as described in <br /> Title 27 §20415(b)(c) and (d). <br /> Pursuant to Title 27 §20415 (e)(6) Initial Background Sampling—For each Unit,the discharger <br /> shall collect all data necessary for selecting the appropriate data analysis methods pursuant to <br /> ¶(e)(7-9) and for establishing the background values specified pursuant to¶ (e)(10). At a <br /> minimum, this data shall include analytical data obtained during quarterly sampling of all <br /> Background Monitoring Points for a period of one year, including the times of expected highest <br /> and lowest annual elevations of the ground water surface. For a new Unit, this data shall be <br /> collected before wastes are discharged at the Unit and background soil pore liquid data shall be <br /> collected from beneath the Unit before the Unit is constructed. <br /> 16. Title 27 §21750(h) Land and Water Use. Section incomplete. The following information needs <br /> to be included in RWD: <br /> (1) Well Map—A map showing the locations of all water wells, oil wells, and geothermal <br /> wells within the facility boundary and showing the locations of all such wells within one mile <br /> outside of the facility boundary. <br /> (2) Well Owner—Name and address of the owner of each well indicated in&(h)(1). <br /> (3) Well Information—Well information, where available, for each water well indicated in <br /> &(h)(1) including, but not limited to: <br /> (A) total depth of well; <br /> (B) diameter of casing at ground surface and at total depth; <br /> (C) type of well construction(cable tool, rotary, etc.); <br /> (D) depth and type of perforations; <br />