My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR RPCE:4 <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) n('T 2 5 2017 <br /> 1. Site map enclosed? YES [] NO [>I <br /> .NMP-!7WN,17NTAL HEALTH <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates-W-reeph <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Dispenser 5 & 6 unable to obtain interstitial communication on Bravo UDC. After consulting with manufacturer <br /> they recommend installing a new communication port on the inside of UDC in order to see if we can obtain <br /> communication. Attached is the part number and picture of port manufacturer informs that there is no cut sheet <br /> available. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> (1) Test-fit-frp Double wall test port fitting <br /> (1) Ep100-rf Epoxy kit <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.