My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Don <br /> K, Mukai <br /> SEP 2 3 2016 <br /> MECHANICAL ENGINELK ENVIRONMENTAL HEALTH <br /> 1841 Pajama St. Pasadena, CA 9-1104 DEPARTN-ENT <br /> 323-880-4136 <br /> .lune 1. 2010 Rev. 10 24.11 <br /> Mrs. Paola Recendea <br /> S.Bravo Systems,Inc. <br /> 2929 Vail Ave. <br /> Commerce, CA 90040 <br /> Re: Specification approved by a state registered professional engineer <br /> CCR"fitle 23.Division 3. Chapter 16.Article 3. Section 2631(d) <br /> This letter is for an engnieering specification review and approval of a secondary containment <br /> system component which is not an integral part of primary containment for an underground <br /> fuel tank storage system in California. The authority for this approval coarses from the <br /> California Code of Regulations (CCR) Title 23, Division 3, Chapter 16, ;article 3, Section <br /> 2631(d). <br /> I have examined and reviewed the following specifications on the Bravo F-Series r1berUlass split <br /> reirrstit-Retr0it-8-and-'Rctrotit-SD-Al3-'fittings: <br /> 1) UL Certifications Directory M. 1-126018 for Vipel F-764 and F-774 resins <br /> 2) .AOC Vipel Product Selection Guide& Corrosion Resistance Guide <br /> 3) Bravo datasheets F-Series-SW-10A,F-Series-DW 10A.F-Series-BLR-1 IA. <br /> F-Series-D-BLR-S-11B,F-Series-Retrofit-S-1113 and Fr-Series-Retrofit-SD-AB-I IA <br /> 4) Bravo Installation Manuals ii-F-SERIES-TS-IIA. ii-F-SERIES-TS-D-I IA. <br /> ii-F-SERIES-SS-09B, ii-F-SERIES-TS-ADJ-CNSERF, ii-F-SERIES-IX-SS-IiA. <br /> ii-F-SE-RICS-tX-SS-D-IIA.ii-F-SERIES-LCX-09B.ii-F-SERIES-I.CX-D-09B, <br /> ii-FS-tZETROFIT S-10C, ii-FS-RETROFIT-SD-AB-10A.ii-SANDKIT--IIB <br /> 5) Bravo Systems Third Party document 3RP-F-Series and 3RP-FS-FIX-D-BLR-S <br /> 6) Bravo Systems UL Approval doe-unent CUI--FSeries <br /> 7) 'Bravo material compatibility letters Sttnips_AlternativeFuels_R1 and <br /> Fittings_AlternativeFuels R1 <br /> s) Smith Bulletin D4025.D4010 and B2102 <br /> 9) Anieron PSX--20 Adhesive kit-Bondstrand Product Data FP698B <br /> 10) Bravo ADUESIVE-EPDXY K,IT and ADHESIVE-RETROFIT EPDXY KIT <br /> This system provides a bonded retrofit solution to replace from the inside of a single wall fiberglass <br /> containment stunp or from both sides of a double wall fiberglass containment sump, a suspect or <br /> failing fle?tible penetration fittuig.This product maintains the integrity of.A single walled containment <br /> sump or Loth the primary and secondary Avatt of double ~hall containment sump including the <br /> integrity of ft's existing interstice by permanently bonding the sump null to the fiberglass pipe or <br /> conduit at each entry point <br /> C onlinuecl oil Pa-ze 2... <br /> 3RP-FS-RETROFIT-S PAGE 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.