Laserfiche WebLink
Californi- Regional Water Quality Co-trol Board <br /> Central Valley Region <br /> Karl E.Longley,ScD,P.E.,Chair <br /> Linda S.Adams 11020 Sun Center Drive#200,Rancho Cordova,California 95670.6114 Arnold <br /> SecEnvironmental <br /> Phone(916)464-3291 •FAX(916)464-4645 Schwarzenegger <br /> En rotectenla/ http://www.waterboards.ca.gov/centralvalley Governor <br /> Protection <br /> 18 September 2008 , <br /> Gonzales Trucking i�lt t{Eh��N <br /> c/o Ms. Vickie Mello <br /> 24774 Ullrey Avenue <br /> Escalon, CA 95320 <br /> DOCUMENT REVIEW, TONY GONZALES TRUCKING, 1855 JACKSON AVENUE, <br /> ESCALON, SAN JOAQUIN COUNTY(LUSTIS NO. 390220) <br /> 1 reviewed the 15 September 2008 Results of Public Participation and Workplan for Vapor <br /> Extraction Well Destruction (Report/Workplan) submitted on your behalf by Ground Zero <br /> Analysis, Inc. (GZA) after conducting public participation prior to case closure, and to remove <br /> three vapor extraction wells onsite. The Report section of the document stated that there were <br /> no comments received during the 45-day comment period by GZA concerning the proposed <br /> site closure. The Workplan section of the document proposes the decommissioning of soil <br /> vapor wells VW-1A, VW-1 B, and VW-2 by over-drilling with a 10-inch auger and backfilling the <br /> boring to surface with neat cement. VW-1A and VW-1 B (nested well) will be checked at 5-foot <br /> intervals for level, to assure that the auger is centered in the 10-inch diameter boring. <br /> The Report is accepted. Since the Regional Board did not receive comments during the open <br /> comment period and since your site is on track for closure, you may proceed with the wells <br /> decommissioning. The Workplan approval is contingent upon meeting the well abandonment <br /> requirements for San Joaquin County and receiving a boring permit from the San Joaquin <br /> County Environmental Health Department (SJCEHD). Please give the SJCEHD and myself at <br /> least three working days notice prior to initiation of fieldwork and provide a well destruction <br /> report within 30 days of completion of the.fieldwork. If you have any questions, please <br /> contact me at (916) 4644615 or by email at jba.rton@waterboards.ca.gov.- <br /> James <br /> _ <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> cc: Mr. Mark Owens, State Water Resources Control Board, UST Cleanup Fund, Sacramento <br /> Ms. Lori Duncan, San Joaquin County Environmental Health Services, Stockton <br /> Mr. Eric Price, Ground Zero Analysis, Inc., 1714 Main St., Escalon 95320 <br /> California Environmental Protection Agency <br /> Of Recycled Paper <br />