Laserfiche WebLink
TAAME2 <br /> SUMMARY OF VAPOR EACTION TEST RESULTS <br /> Tony Gonzales Trucking <br /> 1855 Jackson Avenue, Escalon, California <br /> Page 2 of 3 <br /> I <br /> VAPOR EXTRACTION TEST MONITORING DATA - WELL VW-113 <br /> Project Number: 400 Project Manager: John Lane Data Collected by: Del-Tech and Date: 12111/01-12/18/01 <br /> Ground Zero Analysis, Inc. <br /> Site Address: 1855 Jackson Ave., Escalon, California Data Checked by: John Lane Test Unit: <br /> IC Engine <br /> EXTRACTION WEI-L:VEW-1 B DATA <br /> OBSERVATION WELL DATA <br /> patelTime TotaCAir ;Total Air< Arr . Applied Welihead., PID/OVA. Engine Vapor Sample VW 1A VW-2 <br /> Veloci <br /> Y Tem Peratu�e Vacuum Cont. Nym6er <br /> Flow Rate <br /> V. <br /> lftlmin} {CFMI (deg FI {in H2O} 4PPm1 RPM <br /> Vawurri <br /> 0 n H2O1 ::` irn H2dj.. <br /> %Applied %Applied <br /> Vacuum- Vacuum <br /> 12-11110:00 15 60 30 80 0.5 1.67 0.2 0.67 <br /> 12-11110:30 -- 18 64 30 110 -- -- O.6 2.00 0.2 D,67 <br /> I I <br /> 12-11111:00 18 66 30-33 130 0.8 2.42-2.66 0.5 1.52-1.67 <br /> 12-11111:30 20-40 67 30-40 136 0.8 2.00-2.67 0.7 1.75-2.33 <br /> 12-11112:00 20-40 68 40 199 VEW-1 B 12:00 0.6 1.50 0.8 2.00 <br /> 12-14110:00 45 56 60-70 160 0.8 1.14.1.33 1.1 1.57-1.83 <br /> 12-14111-.00 50 60 60 1780.9 1.50 1.1 1.63 <br /> I <br /> 12-14112:43 -- 50 fit 55 80 -- VW1612:54 0.9 1.64 1.1 2,00 <br /> i 2 14115:26 50 60 55 0.85 1.55 1.2 2.18 <br /> I <br /> 12-14115:36 40 60 56 130 2400 0.8 1.43 1.2 2.14 <br /> 12-14117:30 35 56 48 100 1.0 2.08 1.1 2.29 <br /> I <br /> Horizontal Distance from Extraction Well-Screen to Screen Distance: 0 feet- 12 feet 19 feet- 19 feat <br /> F <br />