My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
902
>
2900 - Site Mitigation Program
>
PR0538738
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:19:48 PM
Creation date
2/6/2020 9:21:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0538738
PE
2950
FACILITY_ID
FA0022243
FACILITY_NAME
NEIL O ANDERSON & ASSOC INC
STREET_NUMBER
902
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
902 INDUSTRIAL WAY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JO 1 <br /> ael Isaesser@s j ceh d.com <br /> From: Heather Shaddox [mailto:heather.shaddox(cbnoanderson.coml <br /> Sent:Thursday, March 06, 2014 11:34 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Cc: Steven Shih [EH] <br /> Subject: Neil O. Anderson &Associates, Waste Water Disposal System <br /> Adrienne Ellsaesser, <br /> I'm Heather Shaddox with Neil O. Anderson &Associates and will be developing a Work Plan with our Environmental <br /> Division Manger, Daniel Kramer,for sampling our current dry wells and installing an appropriate waste water disposal <br /> system. I have a few preliminary questions about the process and Work Plan: <br /> • Is it correct that a Work Plan is required?Will we receive documentation stating what is required? <br /> • Should the Work Plan address sampling the current dry well and installing an appropriate disposal system? <br /> Should it address anything else? <br /> • We plan to test groundwater samples for pH, Heavy Metals(including Chromium), and Total Dissolved <br /> Solids. Is this adequate? <br /> • Does the Work Plan need to be reviewed and approved prior to sampling and installation activities? <br /> We very much appreciate your assistance in answering these questions to ensure that we are in full compliance as soon <br /> as possible. If you prefer to address these questions by phone, please call me or Daniel Kramer at our office <br /> (209.367.3701) or my direct line (209.333.5744). Thank you very much. <br /> Sincerely, <br /> NEIL O.ANDERSON&ASSOCIATES,INC. <br /> Heather Shaddox <br /> Staff Geologist <br /> 209.367.3701 <br /> Fax 209.333.8303 <br /> 90/2 Industrial Way• Lodi, CA 95240 <br /> AONRDENTIALITY NOTICE: This communication and any accompanying document(s)are confidential and privileged. They are intended for <br /> the sole use of the addressee. If you receive this transmission in error,you are advised that any disclosure,copying,distribution,or the taking of any <br /> action in reliance upon the communication is strictly prohibited. If you have received this communication in error,please <br /> email heather.shaddoxgDnoanderson.com or telephone(209)367-3701.Thank you. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.