My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
902
>
2900 - Site Mitigation Program
>
PR0538738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:52:39 AM
Creation date
2/6/2020 9:22:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538738
PE
2950
FACILITY_ID
FA0022243
FACILITY_NAME
NEIL O ANDERSON & ASSOC INC
STREET_NUMBER
902
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
902 INDUSTRIAL WAY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOA Drywell Closure and Investigation Work Plan Page 8 of 16 <br /> March 18, 2014 <br /> plastic end caps and secured with silicone-based tape. Sample end caps will be labeled <br /> appropriately. Sealed and labeled samples will then be placed in cooled ice chests for <br /> transportation to the analytical laboratory. <br /> 3.4 Equipment Decontamination <br /> All sampling equipment will be decontaminated before and after each sampling event. All <br /> ' sampling equipment will be disassembled, washed in a solution of Liqui-Nox detergent or <br /> equivalent and tap water, rinsed with tap water, rinsed with isopropyl alcohol, triple rinsed with <br /> distilled water, rinsed with acid, and lastly rinsed with certified organic free water. <br /> Cleaning will be conducted in such a manner so as to contain the water, which will be placed in <br /> appropriate containment vessels, labeled, sealed, and stored prior to disposal. Disposal <br /> ' methodologies will be contingent upon field observations and/or analytical results. <br /> 3.5 Sample Analysis <br /> 3.5.1 Groundwater <br /> Six (6) groundwater samples will be collected from each of the three (3) borings. Each <br /> groundwater sample will be analyzed for a separate constituent, including the following: <br /> Volatile Organics by EPA Method 8260. <br /> Semi-Volatile Organics by EPA Method 8270 <br /> RCRA Metals by EPA Method 6010 <br /> Total Petroleum Hydrocarbons as Gasoline by EPA Method 8015 <br /> Total Petroleum Hydrocarbons as Diesel by EPA Method 8015 <br /> Total Recoverable Petroleum Hydrocarbons by EPA Method 8440 <br /> One (1) groundwater sample will be collected and split between two identical containers to <br /> fulfill the Replicate Samples Quality Control/Quality Assurance requirement (See Section 4.6). <br /> Both containers will be analyzed for the following: <br /> ' 0 RCRA Metals by EPA Method 6010 <br /> In addition, the pH of the groundwater in each drywell will be measured in the field by a <br /> Geologist or Engineer using a handheld pH meter. <br /> All analyses will be provided by McCampbell Analytical in Pittsburg, California. <br /> 902 Industrial Way•Lodi,CA 95240.209.367.3701 •Fax 209.369.4228 02014 Neil 0.Anderson&Associates,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.