My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOPER
>
206
>
2900 - Site Mitigation Program
>
PR0539519
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:35:45 AM
Creation date
2/6/2020 9:38:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539519
PE
2965
FACILITY_ID
FA0022602
FACILITY_NAME
MO-1, ROUGH AND READY DREDGE MATERIALS PLACEMENT SITE
STREET_NUMBER
206
STREET_NAME
HOOPER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
01
SITE_LOCATION
206 HOOPER ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� T • <br /> WORK PLAN 0 <br /> FOR GROUND WATER WELL INSTALLATION AND MONITORING <br /> PORT OF STOCKTON-ROUGH AND READY ISLAND,CALIFORNIA <br /> Table of Contents <br /> SECTION PAGE <br /> 1. INTRODUCTION ......................................................................................................1 <br /> 2. BACKGROUND .........................................................................................................1 <br /> 2.1 Description of MO-1............................................................................................................1 <br /> 2.2 Regional Setting2 <br /> 2.2.1 Development of the Levee System............................................................................... <br /> 2.2.2 Regional Geologic and Hydrogeologic Setting..................................................................2 <br /> 2.2.3 Beneficial Uses of Water..............................................................................................3 <br /> 2.3 Local Setting........................................................................................................................3 <br /> 2.3.1 Local Geologic Setting.................................................................................................3 <br /> 2.3.2 Local Hydrologic Setting......................................................................................................4 <br /> 2.3.3 Quality of Shallow Soil.................................................................................................5 <br /> 2.3.4 Quality of Shallow Ground Water................................................................................6 <br /> 2.3.5 Calculationg Attenuation Capacity......................................................................................6 <br /> 3. MONITOR WELL INSTALLATION......................................................................7 <br /> 3.1 Task 1: Permitting, Utility Clearance, and Health and Safety Plan.....................................7 <br /> 3.2 Task 2: Monitor Well Installation........................................................................................8 <br /> 3.2.1 Monitor Well Location.................................................................................................8 <br /> 3.2.2 Soil Logging and Sampling ..........................................................................................9 <br /> 3.2.3 Monitor Well Construction.........................................................................................10 <br /> 3.2.4 Well Development......................................................................................................10 <br /> 3.2.5 Survey Well Locations................................................................................................10 <br /> 3.2.6 Ground Water Sampling.............................................................................................11 <br /> 4. QUARTERLY GROUNDWATER MONITORING...........................................11 <br /> 4.1 Ground Water Sampling....................................................................................................11 <br /> 4.2 Groundwater Sample Analysis...........................................................................................1 l <br /> 4.3 Ground Water Monitoring Reports....................................................................................12 <br /> 5. CONCLUSIONS..................................................................................................12 <br /> REFERENCES..................................................................................................................13 <br /> REPORTDISTRIBUTION LIST.................................................................................15 <br /> September 2014 Environmental Risk <br /> Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.