My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:36:45 PM
Creation date
2/6/2020 9:52:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540782
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
715 N HUNTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 October 2001 <br /> AGE-NC Project No. 01-0877 <br /> Page 3 of 7 <br />{ Water Basin (Basin 5-22). The closest surface water feature is the Stockton Deep Water Channel <br /> located approximately 2,000 feet southwest of the site. <br /> 2.3. GROUND WATER DEPTH AND FLOW DIRECTION <br /> Based on data obtained from a nearby site(706 North El Dorado Street)the depth to ground water <br /> at the site is approximately20 to 25 feetbelow surface grade(bsg).The prevailing ground water flow <br /> direction in the vicinity of the site is estimated to be toward the northeast. However,flow direction <br /> may be both locally and seasonably variable. <br /> 3.0. SCOPE OF WORK <br /> The analytical results from the UST removal soil samples indicate that an unauthorized release of <br /> petroleum hydrocarbon compounds from the USTs has occurred at the site. AGE proposes to <br /> advance four soil borings to collect soil and in-situ grab ground water samples to assess the vertical <br /> extent of fuel components in the subsurface. The preliminary site assessment will consist of the <br /> following tasks: <br /> • Permitting and pre-field work preparations; <br /> • Soil sample collection and analysis; <br /> • Ground water sample collection and analysis; and <br /> • Report preparation. <br /> Each of these tasks is described below. <br /> 3.1. PRE-FIELD WORK PREPARATIONS <br /> A health and safety plan will be prepared in accordance with Occupational Safety and Health <br /> Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety <br /> and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, 1985). <br /> Prior to mobilization, each boring location will be clearly marked and a utility clearance obtained <br /> through Underground Service Alert.Drilling pemuts will be obtained from the PHS-EHD,who also <br /> will be notified at least 72 hours prior to initiation of field work to schedule grouting inspections. <br /> Advanced GcoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.