Laserfiche WebLink
w <br /> h <br /> i <br /> 24 October 2001 <br /> AGE-NC Project No. 01 -0877 <br /> Page 7 of 7 <br /> 4.5 , BORING ABANDONMENT <br /> All soil borings will be permanently sealed to prevent vertical migration ofpotential contaminants. <br /> Soil borings shall be abandoned by backfilling with a cement slurry from the total depth to surface <br /> grade. The PHS-EHD will be notified for grout inspection at least 72 hours prior to conducting <br /> grouting procedures. <br /> I <br /> i <br /> Advanced GeoEnvironmental, Inc. <br />