My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003155
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
ARCHIVED REPORTS_XR0003155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:56:51 PM
Creation date
2/6/2020 9:56:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003155
RECORD_ID
PR0540782
PE
2960
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
01
SITE_LOCATION
715 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />' Site Background Information R M B Garage (Erardi Ventures) <br /> Page 3 of 4 <br />' TPH-g, TPH-d, and TPH-mo were detected in the soil samples collected from borings B1 through <br /> B4 at concentrations ranging from 0 38 milligrams per kilogram (mg/kg) to 8,100 mg/kg TPH-g, <br />' 400 mg/kg to 5,500 mg/kg TPH-d, and 200 mg/kg to 9,200 mg/kg TPH-mo Total recoverable <br /> petroleum hydrocarbons (TRPH) were detected in the soil samples collected from borings BI <br /> through B4 at concentrations as high as 36,000 mg/kg(B4-30) One or more of the volatile aromatic <br /> compounds benzene, toluene, ethylbenzene, and xylenes (BTEX) were detected in the samples <br />' collected from borings B 1 through B4 (with the exception of the 15-foot soil sample from B3) at <br /> concentrations as high as 45 mg/kg benzene, 630 mg/kg toluene, 150 mg/kg ethylbenzene, and <br /> 760 mg/kg total xylenes(B4-30) Seven additional volatile organic compounds were detected in the <br />' soil samples at concentrations ranging from 0 010 mg/kg to 440 mg/kg Fuel additives were not <br /> detected at or above laboratory reporting limits in the soil samples <br /> TPH-g and TPH-d were detected in the ground water samples collected from borings B I through B4 <br /> at concentrations as high as 5,400,000 micrograms per liter (µg/1) (BI) and 390,000 µg/l (B4) <br /> TPH-mo was detected in the ground water sample collected from boring B2 at a concentration of <br /> 12,000 µg/l BTEX compounds were detected in the same samples at concentrations as high as <br /> 210,000 gg/l benzene, 540,000 µg11 toluene, 630,000 µg11 ethylbenzene, and 3,820,000 µg11 total <br /> xylenes (B3) Oil and grease were detected in the samples collected from Bl, B2, and B3 at <br /> I concentrations as high as 1,500,000 gg/1(B3) BTEX compounds were detected in the ground water <br /> samples at concentrations as high as 8 5 µg11 benzene, 150 µg/l toluene, 120 gg/l ethylbenzene, and <br /> 1,300 gg/l total xylenes Seven additional volatile organic compounds were detected in the ground <br /> water samples at concentrations ranging from 2,100 gg/l to 2,000,000 µg/l Fuel additives were not <br /> detected at or above laboratory reporting limits in the ground water samples <br /> I On 04, 05, and 25 September 2003, soil borings MW-1 through MW-4 and B5-60 were advanced <br /> at the site Pilot borings MW1 through MW3 and B5 were advanced using a CME-75HT drill rig <br /> equipped with 8 25-inch diameter hollow-stem augers, the drill rig and three-man crew were <br /> supplied by Mitchell Drilling Environmental Pilot boring MW4 was advanced using a limited- <br /> access drill rig(LAR)equipped with 8 25-inch diameter hollow stem-augers,the LAR and three-man <br /> crew were supplied by Cascade Drilling <br /> Borings MW-1 through MW-4 were drilled to a depth of 40 feet bsg for completion as ground water <br /> monitoring wells Boring B5 was drilled deeper in order to define the vertical extent of soil and <br /> ground water contamination The planned total depth of boring B5 was 70 feet bsg, as requested by <br /> the EHD in their approval letter, however a maximum depth of only 60 feet bsg could be achieved <br /> due to the presence of heaving sands <br /> Pilot borings MW-1 through MW-4 were completed as ground water monitoring wells using <br /> two-inch diameter Schedule 40 PVC casing with 0 020-inch slotted screen installed from <br /> I approximately 20 feet to 40 feet bsg in all four borings, with blank casing extended to the surface <br /> The filter pack (No 3 Lonestar sand) was installed from approximately 22 feet to 40 feet bsg A <br /> Advanced GeoEnvironmentai,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.