Laserfiche WebLink
H t} <br /> GROUNDWATER SAMPLING FORM <br /> ' PROJECT INFORMATION 4 <br /> �mca <br /> ROJECT NAME rr� PROJECT NUMBER �, WELL Np mkj <br /> PROJECT MANAGER * t TYPE OF WELL Morntonng Extraction Other <br /> RECORDED BY L SAMPLED BY DATE C <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> u2asing <br /> Diameter <br /> -inc' 4-inch other Sailer - Type <br /> Pump - Type <br /> Well Total Depth ,�� feet below Top of Casing,TO Other - Specify <br /> lq <br /> Depth to Water 91 1( feet below Top of Casing,WL Hydrocarbon Cdors <br /> Water Column Length I J&21 Feet Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> _ <br /> 1% 0 1 X n. C7 . X a = q� Calculated Purge Volume = `L ` —gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = Ca 0 gallons <br /> Wiltiolier {Gaal Diameter chest = Gailonsibnear(bot 2=Q 4=0-86 6=15 8=2-6 <br /> Groundwater Parameter Measurement Meter Type V-qL ST-_ CalibratedYes_No <br /> TIME ELAPSED FLaTEDTWpH EC d PTU��TY �L COMMENTS <br /> TIME � t} <br /> F <br /> Cl <br /> C� �, /150 r <br /> le -6- ' al0,60 c/.C <br /> qI 60 Y.o <br /> zC'e. <br /> r <br /> VAMASSOCIATES <br /> ENVIRONMENTAL,GEOTECHMICAL AMC MATERIALS PRCFE=0NALS <br />