My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003180
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:15:38 PM
Creation date
2/6/2020 10:21:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003180
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�s <br /> FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET ,I <br /> Inspector Name Alex 7-7d res Date of Inspection <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> ES Com onent <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID (ppm) Sampled <br /> V W 1 r 0 #"=iTO <br /> VW2 <br /> VW3 — d e[oieb <br /> VW4 c rarer <br /> Influent before dilution o.- 8 Nf k <br /> Influent after dilution G w' 0 <br /> Effluent NA NA <br /> System Status up/down t) Dilution valve Closes <br /> T O Cumulative Run Time j�►(Q`�-1.5� Propane% E S- <br /> T O High/Low Temperature at Arrival 43 //syr' Piping System WIl4- <br /> T O Vacuum at Arrival V+"A- 5 Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> AS Component <br /> Monitoring Point Pressure (psi) Flowrate(Ifm) I Groundwater Sample Collected <br /> / AS1 3. 0 -� <br /> AS2 r� <br /> i Influent NA <br /> System Status up/down k_)T - Pipe Size I D 2" <br /> Piping System a�-, Particulate filters C L-e avt_,c-J. <br /> Notes including any adjustments made to the AS system <br /> Groundwater Treatment ComponentT <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA <br /> Post vessel#1 NA p p <br /> Effluent NA e 5 1o05- <br /> Total Groundwater Discharged 0240013f" 2 LEL Meter Reading ,^ J. <br /> Inspect piping system ()(G Particulate filters Ee p to Ccd <br /> Notes including an adjustments made to the groundwate treatment system <br /> c► > <br /> a;l� h 0,.)S;• �g ,4d,�(I's ��� r a CA <br /> s <br /> 62596/tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.