My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003183
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:13:18 PM
Creation date
2/6/2020 10:22:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003183
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name p}t4'x -tip«,S Date of Inspection OZIZ(004 <br /> • Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> s <br /> VES orn xongn <br /> Monitoring Point Vacuum (Hg) I Flowrate(cfm) FID(ppm) Sampled <br /> VW1 6 1 / 0 <br /> VW2 � � rg6 t15 #11C1G <br /> VW3 c tcS C <br /> VW4 L Rdb <br /> Influent before dilution <br /> Influent after dilution <br /> Effluent NA NAc 2 MS740 <br /> NAr <br /> p 2 C l&/ y r C7 Q <br /> System Status up/down V 1 Dilution vaive <br /> TO Cumulative Run Time 53 Propane% 44a <br /> TO High/Low Temperature at Arrival l'73ob.`,3 Piping System <br /> TO Vacuum at Arrival 2 2�`i 1� Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> a <br /> 1 <br /> AS C®� ohent <br /> . Monitoring Point I Pressure (psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 Q �- <br /> AS2 2- ; <br /> Influent 3, 0 NA <br /> System Status upldown Pipe Size I D 2" <br /> Piping System C�k_. Particulate filters <br /> Notes Including any adjustments made to the AS system <br /> ��srOfllld�I1F'dt s cltllteR �iO fpotient <br /> s 'n <br /> Monitoring Point Pressure (psi) Total flow Groundwater Sample Collected <br /> Influent NA NA ve <br /> Post vessel#1 NA <br /> Effluent NA 3 <br /> Total Groundwater Discharged LEL Meter Reading <br /> Inspect piping system 011-- Particulate filters <br /> Notes including any adjustments made to the groundwater treatment system <br /> • )l '-SJ' <br /> f� fn eo��aJ� <br /> 625961ta bleslremsys inspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.