My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003188
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:10:12 PM
Creation date
2/6/2020 10:24:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003188
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET g•� 3 <br /> Inspector Name �sfi7 f , Date of Inspection 7-29-07Y <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> '�flM���rrip�tn�tlt� <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 <br /> VW2 <br /> VW3 <br /> VW4 <br /> Influent before dilution <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status up/down . e?w n.." Dilution valve 1 7iARjv <br /> TO Cumulative Run Time 3486. 2- / 'q Propane% <br /> TO High/Low Temperature at Arrival �l p 13 '1' Y Piping System p� <br /> T O Vacuum at Arrival 0 ` 1 +2l`� Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> L — :" <br /> AS Component <br /> Monitoring Point I Pressure (psi) I Flowrate(Ifm) Groundwater Sample Collected <br /> AS 1 <br /> AS2 <br /> Influent ,Q NA <br /> System Status upldown L4 p Pipe Size I D 2" <br /> Piping System r>� r Particulate'Flters <br /> Notes including any adjustments made to the AS system <br /> Grourtdwafer reatment Cqt#ponent <br /> Monitoring Point I Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA i5 �p; <br /> Post vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharged `17.65-6 LEL Meter Reading $ aN --�RtQUA <br /> Inspect piping system JbEJP &- DIAr„*,p PIP IA-J::4 Particulate filters d ,� �� !� -71 q <br /> Notes including any adjustments made to the groundwater treatment system <br /> cswn� -^tri L 01Z <br /> 62596/tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.